ClosedWorksEuropeanRestricted

EU procurement via the non-public procedure for a construction team for the new construction of Openbaar Kindcentrum (OKC) Weisterbeek

Stichting Dynamiek Scholengroep · Restricted · 1 lots · 358772
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Dynamiek Scholengroep intends to select a construction team via a non-public procedure for the new construction of the Openbaar Kindcentrum (OKC) Weisterbeek. The construction team consists of one or more contractors who, within an engineering team, develop a final design (technical design, TO) and realize the works. The contractor(s) bear full responsibility for both the building and the installation technology parts. The assignment falls under the type of works, without a specified CPV code, and requires an integrated approach of design, engineering, and execution within a single contract. The procedure is non-public, meaning only selected candidates will be invited to submit a proposal.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderconstruction teamnew constructionOKC

01What is being requested

Stichting Dynamiek Scholengroep intends to select a construction team via a non-public procedure for the new construction of the Openbaar Kindcentrum (OKC) Weisterbeek. The construction team consists of one or more contractors who, within an engineering team, develop a final design (technical design, TO) and realize the works. The contractor(s) bear full responsibility for both the building and the installation technology parts. The assignment falls under the type of works, without a specified CPV code, and requires an integrated approach of design, engineering, and execution within a single contract. The procedure is non-public, meaning only selected candidates will be invited to submit a proposal.

The new construction of OKC Weisterbeek must be realized by selecting and contracting a (combination of) contractor(s), who, within an engineering team, develop a final design into a technical design (TO) and are thereby also provided the opportunity to realize the works. The (combination of) contractor(s) is fully responsible for both the building and the installation technology parts of the assignment.

45000000Works
1Contractor selection

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BINX Smartility B.V.SME9827×
2Hegeman Bouw & Infra B.V.SME9631×
3BAM Infra B.V.SME9677×
4Combinatie Heijmans - SWARCOUnknown9573×
5BAM Bouw en Techniek bvSME9534×
6Dura Vermeer Infra Regionale Projecten BVSME9558×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific assignment for the construction team of OKC Weisterbeek?
The construction team must, within an engineering team, develop a final design into a technical design (TO) and subsequently realize the works. The contractor(s) bear full responsibility for both the building and the installation technology parts of the new construction.
How is the composition of the construction team arranged?
The assignment can be executed by one or more contractors acting together as a construction team to realize the new construction of the Openbaar Kindcentrum (OKC) Weisterbeek.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159