ClosedWorksEuropeanOpenGreen

Effluent Pipe RWZI

Stichting Waternet · Open · 1 lots · 327902
Type
Works
45200000
Estimated value
€ 12M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Waternet has launched an open tender for the sustainable repair of the effluent pipes on the premises of the RWZI Amsterdam West. The project includes the application of needle felt relining in two pipes on the north and south sides of the site, with lengths ranging from 132 m to 463 m and diameters from 900 mm to 2200 mm. Additionally, inspections and investigations must be carried out to determine defects; if relining proves unsuitable, alternative solutions such as full replacement may be employed. The relining must be finished watertight and provided with flexible transition facilities to accommodate residual settlement differences and thermal deformations. Temporary discharge pipes must be installed and removed to maintain the required capacity. In November 2023, it appeared that the discharge pipes from the measuring gutter to the harbor exhibit leakage; therefore, two PP pipes (Ø 2000 mm, approx. 250 m) have been added to the scope, including a third pipe to guarantee capacity. The construction team phase involves joint research and the selection of the most suitable renovation method.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€11,500,000
estimated value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPeffluent pipereliningWaternet

01What is being requested

Stichting Waternet has launched an open tender for the sustainable repair of the effluent pipes on the premises of the RWZI Amsterdam West. The project includes the application of needle felt relining in two pipes on the north and south sides of the site, with lengths ranging from 132 m to 463 m and diameters from 900 mm to 2200 mm. Additionally, inspections and investigations must be carried out to determine defects; if relining proves unsuitable, alternative solutions such as full replacement may be employed. The relining must be finished watertight and provided with flexible transition facilities to accommodate residual settlement differences and thermal deformations. Temporary discharge pipes must be installed and removed to maintain the required capacity. In November 2023, it appeared that the discharge pipes from the measuring gutter to the harbor exhibit leakage; therefore, two PP pipes (Ø 2000 mm, approx. 250 m) have been added to the scope, including a third pipe to guarantee capacity. The construction team phase involves joint research and the selection of the most suitable renovation method.

The project concerns the sustainable repair of the effluent pipe on the premises of the RWZI Amsterdam West (AW), between the effluent pits of the secondary clarifiers and the effluent gutter. This involves two pipes, one on the north side of the site along the railway and one on the south side along the Westpoortweg.  Regularly, the work to be delivered includes: The application of needle felt relining impregnated with resin in the interior of the effluent pipes with the following dimensions: 132 m length x 900 mm diameter 265 m length x 1250 mm diameter 338 m length x 1600 mm diameter

45200000€ 12MWorks
1Effluent Pipe RWZI€11,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€11,500,000

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2KWS Infra B.V.SME9592×
3ENGIE Infra & Mobility B.V.SME9469×
4BAM Infra B.V.SME9477×
5Boskalis Nederland B.V.SME9470×
6Heijmans Infra B.V.SME9465×

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of work for the effluent pipes?
The project includes the application of needle felt relining with resin in six different pipes with diameters ranging from 900 mm to 2200 mm and lengths from 57 m to 463 m. Additionally, inspections will be carried out and flexible transition facilities must be installed for residual settlement differences and thermal deformations.
What additional work is included for the discharge pipes towards the harbor?
Due to leakage at the intersection with the Dortmuiden road, the renovation, reinforcement, or replacement of two PP pipes (Ø 2000 mm, approx. 250 m each) has been added. To guarantee discharge capacity during the works, a third pipe will be installed.
Has the chosen renovation method been definitively established?
No, during the construction team phase, further investigation will be conducted together with the selected market party. If inspections show that relining is not the most suitable solution for all pipes, it may be decided to use other methods, such as full replacement of the pipes.
How is the discharge capacity guaranteed during the execution of the project?
Functionally maintaining the required discharge capacity of effluent water during the execution phase is achieved through the installation and removal of temporary discharge pipes or the installation of a permanent third pipe.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 12 mln

Gegunde waarden in CPV 45 · werken n=3159