Ea Framework Agreement Public Lighting

gemeente 's-Hertogenbosch · Open · 1 lots · 370798
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

A framework agreement for the replacement and installation of 35,000 light points in 's-Hertogenbosch, focused on SMART city initiatives and the ‘Datastad’ objective. Municipal planning accuracy is CAO-established in 2030 milestones. For market single-action, only a relative open sourcing procedure is arranged.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

A framework agreement for the replacement and installation of 35,000 light points in 's-Hertogenbosch, focused on SMART city initiatives and the ‘Datastad’ objective. Municipal planning accuracy is CAO-established in 2030 milestones. For market single-action, only a relative open sourcing procedure is arranged.

The Public Lighting department has taken significant steps in recent years regarding electrification and the necessary control (also referred to in the market as SMART city). The inventory consists of approx. 35,000 light points, of which approx. 50% are LED and approx. 10% are equipped with a dynamic dimming model or node. Electrification in the city center area is almost complete. We are committed to the 's-Hertogenbosch Datastad' objective. It is expected that, in addition to luminaire electrification, approx. 800 to 1,000 poles must be replaced preventively each year. The Municipality of '

45000000Works
11

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown10073×
2Heijmans Infra B.V.SME10065×
3KWS Infra B.V.SME9592×
4BAM Bouw en Techniek bvSME9534×
5Croonwolter&dros B.V.SME9525×
6SPIE Nederland B.V.SME9523×

05Tender documents

TN515814 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250630124740pdfJul 1, 2025 · 11 KB
Vervanging OVL 2025-2031_2025april25rsxMay 1, 2025 · 785 KB
Nota van Inlichtingen 2 gunningfase - Ea Raamovk Openbare verlichtingpdfMay 1, 2025 · 100 KB
Bijlage 03 - Prijzenblad NvI2xlsxMay 1, 2025 · 56 KB
Nota van Inlichtingen 1 gunningfase - Ea Raamovk Openbare verlichtingpdfApr 18, 2025 · 199 KB
TN515814 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250324084536pdfMar 24, 2025 · 10 KB
Nota van inlichtingen 2025-03-24-1pdfMar 24, 2025 · 2 KB
BD - Openbare verlichtingpdfMar 14, 2025 · 548 KB
TN515814 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250313100510pdfMar 14, 2025 · 10 KB
Overige bijlagen Beschrijvend DocumentzipMar 14, 2025 · 6449 KB
Bijlage 1 - RAW Bestek en bijlagenzipMar 14, 2025 · 47049 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the public lighting inventory?
The inventory consists of approximately 35,000 light points. Of these, approximately 50% are LED and approximately 10% are equipped with a dynamic dimming model or node.
What are the expected works regarding poles?
In addition to the electrification of luminaires, it is expected that approximately 800 to 1,000 poles must be replaced preventively each year.
What obligation applies to Social Return?
The contracted bidders must spend at least 2% of the contract value (excluding VAT) on fulfilling the social return obligation.
What are the rights of the contracting authority regarding intellectual property?
The contracting authority obtains an unlimited right of use for all results arising from the framework agreement, including the right to reproduce, modify, disclose, and apply them.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159