PlannedWorksMarktconsultatieGreen

Sustainable variants noise barriers

Provincie Groningen · Marktconsultatie · 1 lots · 407138
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

Market consultation by the provincie Groningen regarding the replacement of noise barriers along the Ring West with a focus on sustainability and circularity.

Works · Marktconsultatie · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPnoise barrierssustainableRing West

01What is being requested

Replacement of existing noise barriers along the Ring West in Groningen with sustainable, circular, and environmentally friendly solutions. The assignment includes the complete removal of barriers GS013 and GS015 and the replacement of cassettes at GS042 and GS043.

As part of our ambition to contribute to a more sustainable living environment, the Ingenieursbureau of the provincie Groningen is preparing a tender regarding the installation of sustainable noise barriers along the Ring West in Groningen. The existing noise barriers require maintenance/replacement. We want to use this task to realize innovative, environmentally friendly, and future-proof solutions.

45000000Works
1Sustainable variants noise barriers

02Strategic insight

Strategic insight · AI analysis
When developing a proposal, focus on achieving as low an MKI score as possible. Ensure that the proposed materials are demonstrably reusable or fully recyclable at the end of their service life. Substantiate the acoustic performance and the technical service life with concrete data or reference projects.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The barriers must consist of at least 70% (volumetric fraction) renewable raw materials according to EN 16575:2014.Important
The expected service life of the noise barriers and/or cassettes must be at least 30 years.Important
Structural and acoustic properties must be at least equivalent to the current situation.Important
The barriers must be suitable for growth with Hedera helix.Important
New barriers must seamlessly connect to the existing Eurorail “Soundkiller” barrier.Important

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9673×
2Heijmans Infra B.V.SME9665×
3Dura Vermeer Infra Regionale Projecten BVSME9558×
4KWS Infra B.V.SME9492×
5SPIE Nederland B.V.SME8923×
6Gebr. van Kessel Wegenbouw B.V.SME8720×

06Tender documents

TN565161 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260106102955pdfJan 6, 2026 · 137 KB
Bijlage 1 - Memo geluidsschermen GS013 en 015 dd 21febr2024pdfJan 6, 2026 · 3379 KB
Marktconsultatie duurzame geluidsschermenpdfJan 6, 2026 · 603 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the purpose of this market exploration?
The purpose is to gain insight into the possibilities, developments, and innovations within the market regarding sustainable noise barriers, so that a well-founded procurement strategy and request for information can be developed.
Which sustainability criteria apply?
The noise barriers must be sustainable, with a focus on CO2-neutral and circular solutions. Specific attention is paid to material, durability, and the MKI score.
What is the required service life of the noise barriers?
The noise barriers must have a service life of at least 30 years.
What technical requirements apply to the construction?
The construction must be at least equivalent to the existing noise barriers. In addition, the barriers must structurally, acoustically, and aesthetically align with the existing barrier GS-059 at certain points.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159