AwardedSuppliesEuropeanOpenGreen

Sustainable electricity & natural gas

Mijnwater Energy B.V. · Open · 1 lots · 353977
Type
Supplies
09310000
Estimated value
€ 4,00M
awarded
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This tender concerns the supply of sustainable electricity and natural gas, whereby specific definitions for consumer profiles and pricing conditions apply.

Supplies · Open · European procedure

Sustainability countsEuropean1 exclusion grounds
Contracting authority
Contract type
Supplies
Open
Estimated value
€4,000,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tenderGreen / SPPsustainable electricityCO2 compensated natural gassupply

01What is being requested

Supply of sustainable electricity and natural gas to the customer during the contract period as established in the agreement.

An EU procurement for the supply of sustainable electricity and CO2 compensated natural gas to Mijnwater Energy B.V.

09310000Supplies
1Sustainable electricity & natural gas

02Outcome

Awarded

Audax Renewables Nederland B.V.

Award value
€4,000,000
Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a complete declaration regarding the absence of Russian involvement. When reviewing the price structure, pay attention to the supply price definitions for both electricity and gas to ensure correct comparison. Carefully check the connection capacity and the consumption profile for correct categorization.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The supplier is solely liable for direct damage caused by negligence, intent, or willful recklessness.Important
Liability for damage is limited to a maximum of € 1,000,000 per event.Important
The customer must arrange a Connection Agreement with the relevant grid operator themselves.Important
The supplier may terminate the Program Responsibility if the customer is in default.Important

05Can I take part?

Exclusion ground — No Russian involvement in accordance with EU Regulation (EU) 2022/576 and EU Regulation (EU) 833/2014.

06Exclusion grounds

Exclusion grounds (1)
  • No Russian involvement in accordance with EU Regulation (EU) 2022/576 and EU Regulation (EU) 833/2014.

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

08Bidders in this segment

#Likely bidderFitWins
1De Groene Stroomfabriek N.V.SME10019×
2Eneco Zakelijk B.V.SME9921×
3VanHelderUnknown9613×
4N.V. Vattenfall Sales NederlandSME9316×
5Gazprom Marketing & Trading Retail LimitedUnknown9116×
6Twee30 B.V.SME91

09Tender documents

TN490398 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20250120102026pdfJan 21, 2025 · 8 KB
Nota van inlichtingen 2024-11-22-1pdfNov 22, 2024 · 2 KB
Aanbestedingsleidraad energie_herziendocxNov 12, 2024 · 89 KB
Bijlage 6 Overzicht EAN codes Aansluitingen inclusief meetdata_herzienxlsxNov 12, 2024 · 13969 KB
TN490398 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20241018142552pdfOct 20, 2024 · 8 KB
Bijlage 3 PvE EG Mijnwater 2027-2028docxOct 20, 2024 · 57 KB
Bijlage 5 (concept) Model Overeenkomst E&G MijnwaterdocxOct 20, 2024 · 47 KB
Bijlage 2 Uniform Europees AanbestedingsdocumentpdfOct 20, 2024 · 546 KB
Bijlage 4 Invulform E&G Prijzen en Services_MijnwaterxlsxOct 20, 2024 · 51 KB
Bijlage 1 DefinitiebladpdfOct 20, 2024 · 132 KB
Bijlage 7 ALV-EM-016_02pdfOct 20, 2024 · 541 KB
Bijlage 8 Verklaring geen Russische betrokkenheidpdfOct 20, 2024 · 105 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the scope of the energy supply?
The assignment includes the supply of sustainable electricity and the supply of natural gas for both large-scale and small-scale consumption of Mijnwater.
Which sustainability requirements must the energy supply meet?
The electricity must be sustainable and the natural gas must be fully CO2-compensated.
Which legal frameworks apply to the supply?
The terms as referred to in Article 54 of the Electricity Act 1998 and Article 22 of the Gas Act apply to the agreement.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226