Sustainable through Waalre: Traverse Noord and Heikantstraat
The Municipality of Waalre is tendering a combined redevelopment of the Traverse Noord and Heikantstraat. The project includes the removal and replacement of vegetation, asphalt, foundations, sewerage and the installation of new sewerage, underground water storage, gullies, foundations, paving, asphalt, signage, marking and street furniture. The works are located at two sites within the municipal boundaries, but are executed as a single contract to minimize traffic disruption. The project is divided into two main phases: Traverse Noord (Bergstraat to Paradijslaan including wadi) and Heikantstraat (outside the built-up area to Valkenswaard). Execution starts in January 2025, with a final completion date for Traverse Noord on December 31, 2025, due to subsidy conditions. The total duration is approximately one and a half years. The contract is intended for an average civil engineering company, without division into lots, and requires an integrated approach for all works.
Works · Restricted · European procedure
01What is being requested
The Municipality of Waalre is tendering a combined redevelopment of the Traverse Noord and Heikantstraat. The project includes the removal and replacement of vegetation, asphalt, foundations, sewerage and the installation of new sewerage, underground water storage, gullies, foundations, paving, asphalt, signage, marking and street furniture. The works are located at two sites within the municipal boundaries, but are executed as a single contract to minimize traffic disruption. The project is divided into two main phases: Traverse Noord (Bergstraat to Paradijslaan including wadi) and Heikantstraat (outside the built-up area to Valkenswaard). Execution starts in January 2025, with a final completion date for Traverse Noord on December 31, 2025, due to subsidy conditions. The total duration is approximately one and a half years. The contract is intended for an average civil engineering company, without division into lots, and requires an integrated approach for all works.
The agreement consists of the redevelopment of the Traverse Noord and the Heikantstraat. The work mainly consists of: - removal of vegetation - removal of asphalt surfacing - removal of element paving - removal of foundations - excavation, transport and processing of soil - removal of existing sewerage - installation of sewerage - installation of underground water storage - installation of gullies - installation of foundations - installation of edge restraints - installation of paving - installation of asphalt surfacing - installation of signage and marking - installation of street furniture
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the intended start date and the expected total duration of the works?
What specific deadline applies to the completion of the Traverse Noord?
Why was one combined contract chosen instead of two separate procedures?
Into which two main phases is the project divided?
What are the most important works included in this contract?
Automatically compiled from the official tender data and documents.