DOS-2022-0001892 Construction Team Planned Maintenance Coenecoopbrug
The Province of Zuid-Holland intends to form a construction team partnership for the planned maintenance of the Coenecoopbrug. The partnership consists of one or more market parties that will jointly prepare the project and the UAV contract (Uniforme Aanbestedingsvoorwaarden). The final execution of the maintenance will take place based on the resulting RAW specification (Richtlijn Aanbesteding Werk). The procedure is non-public, allowing the contracting authority to approach a limited number of suitable partners. The focus is on an integrated approach where design, engineering, and execution are brought together in a single team.
Works · Restricted · European procedure
01What is being requested
The Province of Zuid-Holland intends to form a construction team partnership for the planned maintenance of the Coenecoopbrug. The partnership consists of one or more market parties that will jointly prepare the project and the UAV contract (Uniforme Aanbestedingsvoorwaarden). The final execution of the maintenance will take place based on the resulting RAW specification (Richtlijn Aanbesteding Werk). The procedure is non-public, allowing the contracting authority to approach a limited number of suitable partners. The focus is on an integrated approach where design, engineering, and execution are brought together in a single team.
The contracting authority wishes to enter into a partnership in a construction team model with one or more market parties for the preparation and UAV contract formation of the works. For the contract that may be awarded to the Contractor for the execution of the planned maintenance, the principle is execution based on the resulting RAW specification(s).
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the collaboration with the construction team?
On what basis will the maintenance be executed?
What does the requested contract formation entail?