AwardedWorksEuropeanOpen

Through-cycling route Utrecht Science Park - Veenendaal

Provincie Utrecht · Open · 1 lots · 282626
Type
Works
45233222
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Province of Utrecht has launched an open tender for the renovation of the existing infrastructure of the through-cycling route between Utrecht Science Park and Veenendaal. The project includes the application or renewal of asphalt and foundations, the replacement of paving elements, the renewal of drainage, the improvement of edge restraints, verges, markings and signage, and the repair or relocation of objects such as loops and public lighting. Additionally, the occasional removal of trees is part of the works. The assignment focuses on meeting current requirements and standards for a bicycle-friendly route, with attention to sustainability, safety, and accessibility. The execution requires an integrated approach to roadworks, water management, and landscaping, with the continuity of the cycle path and minimal disruption to traffic and the environment being central.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45WorksEU tenderthrough-cycling routeasphaltpaving

01What is being requested

The Province of Utrecht has launched an open tender for the renovation of the existing infrastructure of the through-cycling route between Utrecht Science Park and Veenendaal. The project includes the application or renewal of asphalt and foundations, the replacement of paving elements, the renewal of drainage, the improvement of edge restraints, verges, markings and signage, and the repair or relocation of objects such as loops and public lighting. Additionally, the occasional removal of trees is part of the works. The assignment focuses on meeting current requirements and standards for a bicycle-friendly route, with attention to sustainability, safety, and accessibility. The execution requires an integrated approach to roadworks, water management, and landscaping, with the continuity of the cycle path and minimal disruption to traffic and the environment being central.

Ensuring the existing infrastructure meets current requirements and standards for a through-cycling route by means of: - Applying or renewing asphalt and foundations; - Replacing paving elements and asphalt; - Renewing drainage; - Renewing/improving edge restraints (bicycle-friendly); - Renewing verges; - Improving markings and signage; - Repairing/relocating objects such as loops and public lighting; - Occasional removal of trees.

45233222Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3D. van der Steen B.V.SME10031×
4Boskalis Nederland B.V.SME10069×
5Van Gelder BVSME9953×
6Dura Vermeer Infra Regionale Projecten BVSME9858×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the works for the through-cycling route?
The assignment includes adjusting the infrastructure by applying or renewing asphalt and foundations, replacing paving elements, renewing drainage, and improving edge restraints, verges, markings, and signage. Additionally, the repair or relocation of objects such as loops and lighting will take place, and occasionally the removal of trees.
What specific improvements are being implemented to the road surfaces and edges?
The works focus on meeting current requirements and standards for a through-cycling route. This is achieved by renewing asphalt and foundations, replacing paving elements, and improving edge restraints to make the route more bicycle-friendly.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159