ClosedServicesEuropeanOpenGreen

Project management and supervision of construction for the recycling station and other new buildings at the Lodewijkstraat

Gemeenschappelijke Regeling Cure · Open · 1 lots · 393072
Type
Services
71300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

Tender for the project management and supervision of the construction of a new recycling station and associated buildings in Eindhoven. The award will be based on the best price-quality ratio.

Services · Open · European procedure

Sustainability countsEuropeanComplete timeline
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderGreen / SPP

01What is being requested

The assignment concerns the project management and supervision of the redevelopment of a recycling station at the Lodewijkstraat, including the construction of a manager's building, service desk, and canopy. The execution of the works covers a period of 41 weeks.

It concerns project management and supervision of the civil engineering and building works for the construction of a recycling station and various other buildings, including a manager's building at the Location: Lodewijkstraat in Eindhoven.

71300000Services
1Project management and supervision recycling station Lodewijkstraat€1

02Strategic insight

Strategic insight · AI analysis
Ensure a very detailed plan of approach to achieve the maximum fictitious discount. Strictly check whether the CVs of key personnel contain all minimum requirements and experience with the correct contract sums. Pay attention to the strict page limit and the font to prevent exclusion.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The plan of approach may have a maximum size of 3x A4.Important
The plan of approach must use the Arial font 10.Important
Bids that do not meet the size requirements will be excluded.Important
Submitting variants or alternatives is not permitted.Important
The price offer concerns a fixed price throughout the entire duration.Important
There will be no indexation of agreed prices during execution.Important

04Can I take part?

Financial · 1
Experience in building recycling stations with a contract sum of at least € 3,000,000.Financial
Technical · 6
Provided project management, supervision, and architectural guidance for the construction of a recycling station in the last 10 years.Technical
Valid ISO 9001 certification.Technical
VCA* of the employees offered by you.Technical
Deployable project manager: HBO degree, >5 years relevant experience in civil engineering projects, experience with recycling stations (>€ 3,000,000) in the last 6 years and VCA Vol.Technical
Deployable supervisor/SME: MBO degree (HBO level), BRL SIKB 6000 certified, >5 years relevant experience and experience with recycling stations (>€ 3,000,000) in the last 6 years and VCA Vol.Technical
Deployable architect: HBO education (university level), >5 years experience with architectural construction guidance (>€ 300,000) and experience with recycling stations and manager's buildings.Technical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Qualityweight n/a

Assessment based on a plan of approach with eight specific aspects, whereby scores of 6, 8, or 10 are converted into a fictitious discount of € 0.00, € 25,000.00, or € 75,000.00 respectively.

Priceweight n/a

The price is based on the entered hourly rates for the project manager, architect, supervisor/SME, and other works.

07Process & timeline

Publication date
17-09-2025
Deadline and time for submitting questions
06-10-2025 tot uiterlijk 12.00 uur
Publication of notice of clarification
20-10-2025
Deadline and time for bids
03-11-2025 tot uiterlijk 12.00 uur
Notification of award decision
10-11-2025
Final award
01-12-2025

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

09Likely competitors

#Likely bidderFitWins
1Haskoning Nederland B.V.SME98129×
2Sweco Nederland B.V. SME9895×
3Kragten B.V.SME9822×
4Goudappel B.V.SME9817×
5Arcadis Nederland B.V.SME97151×
6Antea Nederland BVSME9777×

10Tender documents

TN546913 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251201094728pdfDec 2, 2025 · 9 KB
Nota van inlichtingen 2025-10-08-1pdfOct 8, 2025 · 11 KB
bijlage 3 conceptovereenkomstpdfSep 18, 2025 · 619 KB
bijlage 2 prijzenblad directievoeringxlsxSep 18, 2025 · 21 KB
Bijlage 4 Algemene inkoopvoorwaarden voor leveringen en diensten Cure 2025pdfSep 18, 2025 · 177 KB
1 aanbestedingsleidraad directievoering toezicht LodewijkstraatpdfSep 18, 2025 · 632 KB
uea_546913_20250917130643pdfSep 18, 2025 · 364 KB
TN546913 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250917131804pdfSep 18, 2025 · 7 KB
Bijlage A ReferentieverklaringdocxSep 18, 2025 · 182 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the specific scope of the assignment for the redevelopment at the Lodewijkstraat?
The assignment includes the project management and supervision of the civil engineering and building works for the construction of a new recycling station and various other buildings, including a manager's building. This follows the demolition of the current structures and the adjustment of existing paving.
Which roles are requested within the lot for project management and supervision?
For the execution of the project management and supervision of the recycling station and the other new buildings (including the manager's building), 1 project manager, 1 supervisor, and 1 architect are requested.
Which sustainability aspects are relevant to this assignment?
The redevelopment focuses on the construction of a new recycling station where, where possible, use will be made of the reuse of existing materials.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713