AwardedWorksRestricted

Dike improvement de Aa

Stichting Waternet · Restricted · 282487
Type
Works
45200000
Estimated value
€ 1,25M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Waternet, on behalf of the Amstel, Gooi en Vecht water board, intends to improve the dike along the river de Aa. The assignment consists of two main components: a rural section of approximately 500 m, primarily earthworks for raising and reinforcement, and a construction section near Oud Aa of approximately 200 m, in which a plastic screen in combination with steel piles will be installed as a height-retaining screen. The works require precise coordination with water and environmental legislation, safe execution in a floating water area, and the minimization of disturbances to the local community. The tender is non-public, which means limited competition, but offers opportunities for specialized contractors with experience in dike improvement and the construction of plastic-steel screens.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€1,249,000
awarded value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksdike improvementearth raisingplastic screen

01What is being requested

Stichting Waternet, on behalf of the Amstel, Gooi en Vecht water board, intends to improve the dike along the river de Aa. The assignment consists of two main components: a rural section of approximately 500 m, primarily earthworks for raising and reinforcement, and a construction section near Oud Aa of approximately 200 m, in which a plastic screen in combination with steel piles will be installed as a height-retaining screen. The works require precise coordination with water and environmental legislation, safe execution in a floating water area, and the minimization of disturbances to the local community. The tender is non-public, which means limited competition, but offers opportunities for specialized contractors with experience in dike improvement and the construction of plastic-steel screens.

Waterschap Amstel, Gooi en Vecht intends to raise and reinforce the dike along the river de Aa in the section near Oud Aa and a section near Nieuwer Ter Aa. This concerns a dike improvement in the form of earth raising and supplementation. Additionally, on a section in the back gardens, a plastic screen in combination with steel piles will be installed as a height-retaining screen. The works roughly consist of 2 parts: 1) Rural section (primarily earthworks) over a length of approx. 500 m 2) Oud Aa section (construction) length approx. 200 m

45200000Works

02Outcome

Awarded

JdB GWW B.V.

Award value
€1,249,000

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2Heijmans Infra B.V.SME9865×
3Boskalis Nederland B.V.SME9769×
4Dura Vermeer Infra Regionale Projecten BVSME9658×
5BAM Infra B.V.SME9577×
6Combinatie Heijmans - SWARCOUnknown9573×

05Tender documents

TN413377 - SF03 Aankondiging van een gegunde opdracht 20230524100802pdfMay 24, 2023 · 25 KB
TN390770 - SF02 Aankondiging van een opdracht 20221213094517pdfDec 13, 2022 · 28 KB

06Legal themes that may be relevant here

07Frequently asked questions

What does the assignment for dike improvement de Aa entail?
The assignment includes raising and reinforcing the dike along the river de Aa near Oud Aa and Nieuwer Ter Aa. This consists of a rural section of approximately 500 meters, primarily involving earthworks, and a construction section near Oud Aa of approximately 200 meters, where a plastic screen with steel piles will be installed.
What are the specific works for the construction part?
In the section in Oud Aa, with a length of approximately 200 meters, a height-retaining screen will be placed. This screen consists of a combination of a plastic screen and steel piles.
What is the scope of the earthworks for this dike improvement?
The rural part of the dike improvement covers a length of approximately 500 meters and consists primarily of earthworks for the raising and reinforcement of the dike.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,2 mln

Gegunde waarden in CPV 45 · werken n=3159