ClosedSuppliesEuropeanOpenGreen

Digitalization of (street) waste bins in public spaces, Municipality of Alkmaar

Stadswerk 072 N.V. · Open · 1 lots · 392982
Type
Supplies
34928480
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Stadswerk072 NV is looking for one contractor for the digitalization of waste bins via a SaaS solution. The award will be based on the lowest price for a contract with a maximum duration of 10 years.

Supplies · Open · European procedure

Sustainability countsEuropeanComplete timeline
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 34SuppliesEU tenderGreen / SPP

01What is being requested

Supply, implementation, technical management, and maintenance of a SaaS solution and associated cloud service for monitoring fill levels, planning routes, and registering the emptying of waste bins.

Within the Municipality of Alkmaar, approximately 1,500 street waste bins are positioned. In the current situation, fixed routes are driven to empty these waste bins regardless of the fill level. This leads to unnecessary labor, unnecessary mileage, and potential litter because arrival at a full waste bin may occur too late in the day. It is therefore intended that Stadswerk072 will enter into an agreement with one contractor for the design, implementation, technical management, maintenance, and support of a planning and execution system for emptying waste bins. The digitalization of waste bin

34928480Supplies
1Digitalization of (street) waste bins in public spaces, Municipality of Alkmaar

02Strategic insight

Strategic insight · AI analysis
When pricing, focus on the total tender price as this is the sole award criterion. Ensure full compliance with the GIBIT 2023 conditions and ICT quality standards. Take the SROI obligation into account in the financial planning.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The assignment is not divided into lots.Important
Bidders must agree to the waiting room regulation.Important
The use of general terms and conditions is expressly not permitted and will lead to exclusion.Important
There is an obligation to spend 2% of the contract sum on SROI.Important

04Can I take part?

Financial · 1
Suitability regarding financial and economic standing.Financial
Technical · 2
Suitability regarding technical ability (certifications).Technical
Suitability regarding technical ability (core competencies).Technical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

lowest priceweight n/a

The lowest price award criterion is determined based on the total tender price.

07Process & timeline

Publication of the contract notice
16 september 2025
Deadline for receipt of questions for tender (for the purpose of the 1st Memorandum of Information)
26 september 2025, 12:00
Dispatch of 1st Memorandum of Information
3 oktober 2025
Deadline for receipt of questions for tender (for the purpose of the 2nd Memorandum of Information)
10 oktober 2025, 12:00
Dispatch of 2nd Memorandum of Information
16 oktober 2025
Target date for full implementation and being operational
30 juni 2026

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

09Likely competitors

#Likely bidderFitWins
1Kliko ServiceUnknown9517×
2Terberg Matec Nederland B.V.SME9443×
3M.C.B. Milieu & Techniek B.V.SME9312×
4Ravo B.V.SME9330×
5Scania Nederland B.V.SME9038×
6Newwaste B.V.SME89

10Tender documents

TN539606 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251103122803pdfNov 3, 2025 · 11 KB
Bijlage 5 - Prijzenblad versie 1.3xlsxNov 3, 2025 · 53 KB
03112025 Nota van inlichtingen 5pdfNov 3, 2025 · 35 KB
31102025 Nota van inlichtingen 4pdfOct 31, 2025 · 36 KB
TN539606 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251031123450pdfOct 31, 2025 · 11 KB
Bijlage 5 - Prijzenblad versie 1.2xlsxOct 31, 2025 · 53 KB
21102025 Aanbestedingsdocument Digitalisering afvalbakken v2.0pdfOct 21, 2025 · 359 KB
21102025 - Nota van inlichtingen 3 (mededeling wijziging Stadswerk072)pdfOct 21, 2025 · 34 KB
16102025 - Vragen_en_antwoorden_tweede_vragenronde - Digitaliseren afvalbakkenpdfOct 16, 2025 · 82 KB
TN539606 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251016215126pdfOct 16, 2025 · 11 KB
Overzicht afvalbakken gemeente Alkmaar met maatvoeringxlsxOct 2, 2025 · 22 KB
Bijlage 5 - Prijzenblad versie 1.1xlsxOct 2, 2025 · 55 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the goal of the digitalization of the waste bins in Alkmaar?
The goal is to equip approximately 1,500 street waste bins with sensors to measure the fill level and geographic location. This should lead to a planning and execution system for emptying waste bins, thereby reducing unnecessary labor and mileage and preventing litter.
What does the assignment for the intended contractor entail?
The contractor is responsible for the design, implementation, technical management, maintenance, and support of a planning and execution system for emptying the waste bins.
What specific measures are being taken for high-traffic locations?
To regulate emptying at high-traffic locations where a lot of waste is generated, compactor bins will be deployed.
What is the current situation regarding the emptying of the waste bins?
In the current situation, fixed routes are driven to empty the waste bins, regardless of the actual fill level of the bins.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 280K
median
€ 606K
p75
€ 1,6 mln
deze opdracht

Gegunde waarden in CPV 34 · leveringen n=1101