ClosedWorksEuropeanCompetitive procedure with negotiation

Design, construction and installation of a CO2 capture plant at HVC in Alkmaar

N.V. HVC · Competitive procedure with negotiation · 313203
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the design, construction, and installation of a CO2 capture plant at N.V. HVC in Alkmaar. The project focuses on developing a sustainable solution to reduce the CO2 emissions of the combustion plant. The contracting authority requires a fully integrated concept, including technical specifications, construction plans, safety and environmental management, and a detailed project plan with timelines and cost estimates. The procurement follows a competitive procedure with negotiation, allowing the contractor to present a flexible approach while also having to comply with strict quality and safety standards. Execution requires collaboration with various specialists, including engineers, construction companies, and environmental technical consultants. The contracting authority expects delivery within a set period, with clear reporting and monitoring mechanisms to ensure the performance of the CO2 capture.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderCO2 captureHVCAlkmaar

01What is being requested

The tender concerns the design, construction, and installation of a CO2 capture plant at N.V. HVC in Alkmaar. The project focuses on developing a sustainable solution to reduce the CO2 emissions of the combustion plant. The contracting authority requires a fully integrated concept, including technical specifications, construction plans, safety and environmental management, and a detailed project plan with timelines and cost estimates. The procurement follows a competitive procedure with negotiation, allowing the contractor to present a flexible approach while also having to comply with strict quality and safety standards. Execution requires collaboration with various specialists, including engineers, construction companies, and environmental technical consultants. The contracting authority expects delivery within a set period, with clear reporting and monitoring mechanisms to ensure the performance of the CO2 capture.

Design, construction and installation of a CO2 capture plant at HVC in Alkmaar

Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Eliquo Water & Energy BV potentialSME36
2Hoving Holland International B.V. potentialSME34
3Visser & Smit Bouw bv potentialSME33
4N.V. Vattenfall Sales Nederland potentialSME32
5Inopower A/S potentialUnknown31
6Bemeij Schoonmaakbedrijf B.V. potentialSME31

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the contract?
The contract includes the design, construction, and installation of a CO2 capture plant at HVC in Alkmaar to reduce the CO2 emissions of the combustion plant.
Which components must be included in the conceptual proposal?
The proposal must contain a fully integrated concept, including technical specifications, construction plans, safety and environmental management, and a detailed project plan with timelines and cost estimates.
What expertise is required for the execution of this project?
Execution requires collaboration with various specialists, including engineers, construction companies, and environmental technical consultants.
How is the performance of the CO2 capture guaranteed?
The contracting authority expects the use of clear reporting and monitoring mechanisms to ensure the performance of the CO2 capture.

Automatically compiled from the official tender data and documents.