Design, construction and installation of a CO2 capture plant at HVC in Alkmaar
HVC has a tender for the design, supply, construction, installation, testing and commissioning of a CO2 capture, liquefaction and storage plant in Alkmaar, the Netherlands. The procedure is a competitive procedure with negotiation, involving an initial pre-qualification phase. The assignment excludes civil works but includes all associated auxiliary systems, testing and commissioning activities, and possible maintenance and spare parts support. The focus is on technical expertise in CO2 capture, liquefaction and storage, as well as experience with industrial construction and project management.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
HVC has a tender for the design, supply, construction, installation, testing and commissioning of a CO2 capture, liquefaction and storage plant in Alkmaar, the Netherlands. The procedure is a competitive procedure with negotiation, involving an initial pre-qualification phase. The assignment excludes civil works but includes all associated auxiliary systems, testing and commissioning activities, and possible maintenance and spare parts support. The focus is on technical expertise in CO2 capture, liquefaction and storage, as well as experience with industrial construction and project management.
HVC has prepared this Pre-qualification document for describing the tender procedure and selecting a Contractor for the design, delivery, construct, install, testing and commissioning of a - CO2 capture, liquefaction and storage installation, including all auxiliaries (and excluding civil works), in Alkmaar, The Netherlands (referred to as the “Project”) and possible follow-up maintenance support including spare parts delivery. HVC has chosen the Competitive Procedure with Negotiation for this purpose. Upon pre-qualification Candidates can qualify for receiving an invitation to participate in
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the exact scope of the assignment for the CO2 installation?
Is support also provided after installation?
How does the selection procedure for this assignment work?
Automatically compiled from the official tender data and documents.