Design & Construct of an installation for the production of green gas from biogas
Twence B.V. wishes to contract a contractor for the design and realization of a green gas installation that converts a minimum of 4.1 million Nm³ of biogas into green gas annually and delivers it to the grid operator Enexis. The installation must comply with the quality requirements of Enexis and the capacity must be able to process the upgraded amount of biogas per year. The procedure is non-public, meaning a limited number of pre-qualified bidders will be approached.
Works · Restricted · European procedure
01What is being requested
Twence B.V. wishes to contract a contractor for the design and realization of a green gas installation that converts a minimum of 4.1 million Nm³ of biogas into green gas annually and delivers it to the grid operator Enexis. The installation must comply with the quality requirements of Enexis and the capacity must be able to process the upgraded amount of biogas per year. The procedure is non-public, meaning a limited number of pre-qualified bidders will be approached.
The contracting authority wishes to contract a Contractor for the design and realization of a Green Gas installation that converts the contracting authority's Biogas into Green Gas and delivers it to the local Grid Operator (Enexis). Normal installation must have a capacity with which a minimum of 4,100,000 Nm3 of Biogas per year can be upgraded to Green gas and is delivered at the intake point of the Grid Operator. The quality of the Green gas must comply with the requirements set by the Grid Operator.
02Outcome
Bright Biomethane
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the intended capacity of the green gas installation?
Which quality requirements must the produced green gas meet?
What is the objective of the assignment for the designer and realizer?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln