Design & Build swimming pool Eersel
The Municipality of Eersel utilizes an integrated Design & Build contract for the construction of a new publicly accessible swimming pool, replacing the current Albatros. The project falls under the UAV-GC 2005, meaning the contractor bears both design and execution responsibility. The assignment requires a multifunctional swimming pool that meets contemporary quality standards, accessibility norms, and societal needs. Key aspects include energy efficiency, water treatment, safety facilities, and a flexible layout for various activities. The intended commencement date is summer 2023, implying a tight schedule and timely delivery. The contractor must possess experience with integrated contracts, knowledge of building regulations, and the ability to remain within the established budget. Additionally, it is essential that the design complies with the uniformity requirements of the UAV-GC 2005 and the municipal guidelines for public facilities.
Works · Restricted · European procedure
01What is being requested
The Municipality of Eersel utilizes an integrated Design & Build contract for the construction of a new publicly accessible swimming pool, replacing the current Albatros. The project falls under the UAV-GC 2005, meaning the contractor bears both design and execution responsibility. The assignment requires a multifunctional swimming pool that meets contemporary quality standards, accessibility norms, and societal needs. Key aspects include energy efficiency, water treatment, safety facilities, and a flexible layout for various activities. The intended commencement date is summer 2023, implying a tight schedule and timely delivery. The contractor must possess experience with integrated contracts, knowledge of building regulations, and the ability to remain within the established budget. Additionally, it is essential that the design complies with the uniformity requirements of the UAV-GC 2005 and the municipal guidelines for public facilities.
The agreement consists of the design and realization of the new to be constructed publicly accessible swimming pool in the Municipality of Eersel. By realizing a multifunctional swimming pool, the swimming pool in Eersel will once again meet the quality standards and societal needs of this era. The new swimming pool replaces the current Albatros swimming pool, which has been in use since 1969. Due to the complexity of the project, an integrated contract has been deliberately chosen, in this case a Design and Build agreement (hereinafter: D&B agreement) based on the UAV-GC 2005. The Uniform Adm
02Outcome
Pellikaan Bouwbedrijf B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the contract form of this assignment?
Which general terms and conditions apply to the agreement?
What is the purpose of the new facility to be built?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159