ClosedWorksEuropeanRestrictedGreen

Design & Build multifunctional Sportcentrum Winkelsteeg

gemeente Nijmegen · Restricted · 1 lots · 360581
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Nijmegen intends to replace the current swimming pool Nijmegen-West, the swimming pool Nijmegen Dukenburg, and the Jan Massinkhal with a new, multifunctional sports centre in the Winkelsteeg. The contract concerns a Design & Build construction in which a single contractor is responsible for the entire process of concept development, technical design, engineering, construction, and delivery. The procurement is non-public, allowing the municipality to approach a limited number of certified companies. The focus is on a modern, sustainable sports facility that supports various sports activities (swimming, fitness, recreation), with attention to accessibility, energy efficiency, and future-proof infrastructure. The contractor must comply with Dutch building and safety standards, provide a realistic schedule and cost estimate, and offer an integrated approach that seamlessly aligns design and construction.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPsports centredesign & buildswimming pool

01What is being requested

The Municipality of Nijmegen intends to replace the current swimming pool Nijmegen-West, the swimming pool Nijmegen Dukenburg, and the Jan Massinkhal with a new, multifunctional sports centre in the Winkelsteeg. The contract concerns a Design & Build construction in which a single contractor is responsible for the entire process of concept development, technical design, engineering, construction, and delivery. The procurement is non-public, allowing the municipality to approach a limited number of certified companies. The focus is on a modern, sustainable sports facility that supports various sports activities (swimming, fitness, recreation), with attention to accessibility, energy efficiency, and future-proof infrastructure. The contractor must comply with Dutch building and safety standards, provide a realistic schedule and cost estimate, and offer an integrated approach that seamlessly aligns design and construction.

The reason for this procurement is the replacement of the swimming pool Nijmegen-West, swimming pool Nijmegen Dukenburg, and the Jan Massinkhal. The objective of this contract is to reach an agreement with a contractor for the development, design, and realization of the multifunctional sports centre Winkelsteeg.

45000000Works
1Design & Build multifunctional Sportcentrum Winkelsteeg€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BINX Smartility B.V.SME9827×
2Hegeman Bouw & Infra B.V.SME9431×
3BAM Infra B.V.SME9477×
4Unica Installatietechniek B.V.SME9313×
5K_Dekker bouw & infra B.V.SME9222×
6Burgland Bouw BVSME9113×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the contract for the multifunctional sports centre Winkelsteeg?
The objective is to reach an agreement with a contractor for the development, design, and realization of the multifunctional sports centre Winkelsteeg.
Which existing sports facilities will be replaced by this new centre?
The reason for this contract is the replacement of the swimming pool Nijmegen-West, swimming pool Nijmegen Dukenburg, and the Jan Massinkhal.
What does the Design & Build construction for this contract entail?
The contract concerns a construction in which a single contractor is responsible for the entire process of concept development, technical design, engineering, construction, and delivery.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159