OpenWorksEuropeanRestricted

EU procurement via the restricted procedure for a construction team for the new construction of KC Meule-Nova in Venlo

Stichting Fortior · Restricted · 1 lots · 427836
Type
Works
45000000 · Construction work
Estimated value
Not published
To deadline
19d
Jul 6, 2026 · 10:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

This EU restricted procurement concerns the realization of a new childcare center in Venlo by a construction team. The procedure consists of a selection phase for five candidates, followed by an award phase based on price and quality.

Works · Restricted · European procedure

EuropeanComplete timeline
Contracting authority
Stichting Fortior
Limburg
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
July 6, 2026
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Construction work
Location
Venlo, Limburg
CharacteristicsCPV 45WorksEU tenderNew constructionConstruction teamEngineering

01What is being requested

Realization of a newly built childcare center of approximately 2,961 m2 GFA in Venlo, whereby the contractor is responsible for the engineering team (design) and the execution of both building and installation works.

The new construction of Kindcentrum Meule-Nova in Venlo must be realized by selecting and contracting a contractor (or combination of contractors), who, within an engineering team, develops a final design into a technical design (TD) and thereby is also offered the opportunity to realize the work. The contractor (or combination of contractors) is fully responsible for both the building and the installation part of the assignment.

45000000Works
1EU procurement via the restricted procedure for a construction team for the new construction of KC Meule-Nova in Venlo

02Strategic insight

Strategic insight · AI analysis
Ensure a strong reference that specifically meets the combination of education and childcare. Emphasize circular measures and experience with local residents during the selection phase to earn extra points. Ensure that the financial capacity of any third parties is fully demonstrated via the correct UEA documents.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The assignment is carried out in two phases, where the first phase concerns the development of the technical design.Important
Awarding takes place on the basis of the best price-quality ratio.Important
In the case of a combination of parties, joint and several liability is required for the execution.Important
The assignment for execution will only be awarded if the contracting authority and the contractor are fully in agreement regarding the design and the costs.Important

04Can I take part?

Financial · 1
Sufficient financial and economic capacity, no known claims that jeopardize continuity, and an auditor's report without a continuity paragraph.Financial
Technical · 3
One relevant reference assignment of a childcare center with education, after-school care, and childcare, as a member of a construction team, with a size of at least 1,200 m2 GFA and a value of at least € 2,500,000, carried out in the period 2019-2026.Technical
Possession of a VCA certificate as a company.Technical
NEN-EN-ISO 9001:2015 certified or equivalent.Technical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Quality60 punten

Sub-award criteria are the plan of approach for the construction team phase, plan of approach for the realization phase, quality assurance for delivery in April 2028, and substantiation of an open budget. Maximum 15 points per component.

Price30 punten

Assessment of the price.

Presentation10 punten

Assessment of the presentation.

07Process & timeline

Announcement
2026-06-04
Deadline for questions selection phase
2026-06-25
Memorandum of information selection phase
2026-06-29
Application
2[telefoonnummer verwijderd]:00 uur
Rejection of candidates
2026-07-07
End of objection period selection phase
2026-07-14
Invitation to tender
2026-08-28
Deadline for questions award phase 1st round
2026-09-14
1st Memorandum of information award phase
2026-09-18
Deadline for questions award phase 2nd round
2026-09-23
2nd Memorandum of information award phase
2026-09-28
Submission of tenders
2[telefoonnummer verwijderd]:00 uur
Voorlopige gunning
2026-10-16
Definitieve gunning
2026-11-09

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9858×
2BAM Infra B.V.SME9877×
3BINX Smartility B.V.SME9827×
4Van Gelder BVSME9853×
5KWS Infra B.V.SME9792×
6Kernbouw B.V.SME9511×

10Tender documents

Bijlage 2 AanmeldingsformulierdocxJun 5, 2026 · 38 KB
Bijlage 4 Europees Uniform AanbestedingsdocumentpdfJun 5, 2026 · 500 KB
Bijlage 1 Format vragendocxJun 5, 2026 · 27 KB
Bijlage 3 CombinatieverklaringdocxJun 5, 2026 · 25 KB
Selectieleidraad KC Meule Nova VenlopdfJun 5, 2026 · 676 KB
TN594070 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260604114059pdfJun 5, 2026 · 200 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the core of the assignment for the construction team?
The construction team works in an engineering team to develop the final design into a <strong/em>technical design (TD) and is subsequently responsible for the full realization of the building and installation works.
What expertise is required for the execution of the new construction?
The selected contractor or combination of contractors is fully responsible for both the <strong/em>building and the <strong/em>installation part of the assignment.
How does the selection for participation in the award phase proceed?
A <strong/em>restricted procedure is used, whereby candidates are first selected based on the requirements in the Selection Guide before the final tender takes place.

Automatically compiled from the official tender data and documents.