Concession Agreement Heat System Trekvliet-Maanweg in Den Haag
The Municipality of Den Haag intends to implement a sustainable low-temperature heat system in the Binckhorst district for 5,000–7,500 new residential units and 79,000 m² of commercial buildings. The system must provide heating and cooling via locally available renewable sources (thermal energy storage, aquathermal energy, air-to-water heat pumps). The procurement is a concession agreement whereby one heat company designs, finances, builds, and operates the entire system (sources, storage, pipe network, indoor distribution, and delivery set). The procedure is a competitive dialogue, aimed at innovative, integrated solutions that meet high sustainability standards and a long-term operational guarantee.
Works · Competitive dialogue · European procedure
01What is being requested
The Municipality of Den Haag intends to implement a sustainable low-temperature heat system in the Binckhorst district for 5,000–7,500 new residential units and 79,000 m² of commercial buildings. The system must provide heating and cooling via locally available renewable sources (thermal energy storage, aquathermal energy, air-to-water heat pumps). The procurement is a concession agreement whereby one heat company designs, finances, builds, and operates the entire system (sources, storage, pipe network, indoor distribution, and delivery set). The procedure is a competitive dialogue, aimed at innovative, integrated solutions that meet high sustainability standards and a long-term operational guarantee.
Significant new construction is planned in the Binckhorst district of Den Haag in the coming years, including in the Trekvliet-Maanweg development zone. In this development zone, it is expected that 5,000 – 7,500 new residential units and 79,000 m² GFA of commercial buildings will be constructed over the next 15 years. To provide this new construction with heating and cooling, the Municipality of Den Haag wishes to have a highly sustainable low-temperature heat system installed to which all consumers in the area can be connected. This heating and cooling system must be supplied with heat from
02Outcome
Trekvliet Energie B.V. (Combinatie Heijmans Energie B.V. en Essent Energy Infrastructure Solutions B.V.)
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the scale of the new construction in the Trekvliet-Maanweg development zone?
What are the technical requirements for the heat supply in the Binckhorst district?
Which activities are covered under the concession agreement?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159