ClosedServicesEuropeanRestricted

Heat System Concession Stationsgebied Hilversum

Gemeente Hilversum · Restricted · 1 lots · 374773
Type
Services
65400000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
3
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Concession for the implementation and operation of a collective heating and cooling system in the Stationsgebied of Hilversum.

Services · Restricted · European procedure

European3 exclusion groundsComplete timeline
Contracting authority
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 65ServicesEU tender

01What is being requested

The implementation, operation, and maintenance of a sustainable heat system for the Stationsgebied in Hilversum. The assignment includes the design, financing, and management of a collective ground energy system for approximately 650 dwelling equivalents during an operation period of approximately 30 years.

The objective of the tender is to enter into one Concession Agreement with one Concessionaire for the Heat System for the Stationsgebied in Hilversum. Through the Concession Agreement, the Concessionaire acquires the exclusive right to design, implement, and operate the Heat System at its own expense and risk for the duration of the Concession.

65400000Services
1Concession Agreement Heat System Stationsgebied Hilversum

02Strategic insight

Strategic insight · AI analysis
Ensure full financing of the capital investment. Take into account the phased implementation of the new construction. Coordinate the activities closely with the real estate developers.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The Concessionaire is integrally responsible for the entire heat chain.Important
There is a maximum ramp-up period of 10 years.Important
The system must be transferred in working condition at the end of the term.Important
The Concessionaire must ensure the timely acquisition of permits.Important

04Can I take part?

Financial · 1
Financial and economic standing.Financial
Technical · 1
Technical and professional competence.Technical
Professional capability · 2
Professional competence.Professional capability
Professional suitability.Professional capability
Exclusion ground · 3
Mandatory grounds for exclusion.Exclusion ground
Optional grounds for exclusion.Exclusion ground
Exclusion upon participation under the EU fifth sanctions package against the Russian Federation.Exclusion ground

05Exclusion grounds

Exclusion grounds (3)
  • Mandatory grounds for exclusion.
  • Optional grounds for exclusion.
  • Exclusion upon participation under the EU fifth sanctions package against the Russian Federation.

06Process & timeline

start construction blocks 2 and 3
medio 2027
delivery of heat and cold blocks 2 and 3
eind 2028
connection of existing buildings
2028 - 2030
construction block 1
2030 - 2035

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Croonwolter&dros B.V.SME77
2EnecoUnknown75
3Van Dorp Installaties bvSME72
4Lomans Amersfoort B.V.SME70
5Essent Energy Infrastructure Solutions B.V.SME69
6Van Gelder Verkeerstechniek B.V.SME68

09Tender documents

Nota van inlichtingen 2025-05-21-1pdfMay 21, 2025 · 51 KB
TN520645 - EF19 Concessieaankondiging - concessierichtlijn, standaardregeling 20250521104608pdfMay 21, 2025 · 9 KB
Bijlage D - Principeschema Collectief WKO-systeempdfApr 15, 2025 · 280 KB
Bijlage C - Besluit vergunning mba OBES Stationsgebied Hilv PNH2421pdfApr 15, 2025 · 607 KB
Bijlage 5 - Derde(n)verklaringdocxApr 15, 2025 · 52 KB
Bijlage 3 - Antwoordformulier Geschiktheidseisen en SelectiecriteriadocxApr 15, 2025 · 64 KB
Bijlage 2 - Verklaring van AanmeldingdocxApr 15, 2025 · 55 KB
Bijlage E - Leidraad-warmte-2025pdfApr 15, 2025 · 236 KB
Bijlage 4 - HoldingverklaringdocxApr 15, 2025 · 54 KB
Bijlage F - Juridische structuur WKOpdfApr 15, 2025 · 106 KB
20250411 - Selectieleidraad - Concessie Warmtesysteem Stationsgebied HilversumpdfApr 15, 2025 · 892 KB
Bijlage A - Marktconsultatierapportage WKO Stationsgebied Hilversum v1.1pdfApr 15, 2025 · 700 KB

10Legal themes that may be relevant here

11Frequently asked questions

How many concessionaires will be designated for this project?
One Concession Agreement will be entered into with a single Concessionaire for the Heat System for the Stationsgebied in Hilversum.
How is liability handled regarding the participation of an area entity?
The Municipality of Hilversum is currently designing and working out the contractual structure of the area entity. In doing so, account is being taken of the desire to prevent double liabilities for the Concessionaire.

Automatically compiled from the official tender data and documents.