The European Space Research and Technology Centre (ESTEC) of the European Space Agency (ESA) intends to realize a new building, the International Meeting Facility (IMF), to increase the capacity for conferences, events and external meetings. The IMF will be prominently located, visible from the ESTEC entrance, and serves as the main representative building of the campus. The procurement comprises two phases: first, consultancy for the Detailed Design & Engineering within a Building Team (Bouwteam) Agreement, and subsequently the execution of the construction. The contracting authority is seeking an integrated partner capable of coordinating both design and construction activities, possessing experience with large, representative buildings, and meeting the technical, security, and sustainability requirements of ESA. The procedure is public, without a CPV code, and focuses on a fully integrated approach from concept to completion.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderESTECInternational Meeting Facilitydesign consultancy

01What is being requested

The European Space Research and Technology Centre (ESTEC) of the European Space Agency (ESA) intends to realize a new building, the International Meeting Facility (IMF), to increase the capacity for conferences, events and external meetings. The IMF will be prominently located, visible from the ESTEC entrance, and serves as the main representative building of the campus. The procurement comprises two phases: first, consultancy for the Detailed Design & Engineering within a Building Team (Bouwteam) Agreement, and subsequently the execution of the construction. The contracting authority is seeking an integrated partner capable of coordinating both design and construction activities, possessing experience with large, representative buildings, and meeting the technical, security, and sustainability requirements of ESA. The procedure is public, without a CPV code, and focuses on a fully integrated approach from concept to completion.

The European Space Research and Technology Centre (ESTEC) of the European Space Agency (ESA) intends to construct a new building, the International Meeting Facility (IMF) to increase its capacity to host conferences, events and meetings with external participants. The IMF will be located in a prominent position, visible from the ESTEC entrance and will become the main representative building of the ESTEC campus. ESTEC will select a company, to first, provide consultancy services for the development of the Detailed Design & Engineering within a Building Team (‘Bouwteam’) Agreement, and second,

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9234×
2BINX Smartility B.V.SME9227×
3KWS Infra B.V.SME9192×
4Hegeman Bouw & Infra B.V.SME9131×
5Unica Installatietechniek B.V.SME8713×
6MobilisUnknown8419×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the construction of the International Meeting Facility (IMF)?
The International Meeting Facility (IMF) is being built to increase the capacity for hosting conferences, events and meetings with external participants.
What does the assignment for the selected party entail?
The assignment consists of two phases: first, providing consultancy services for the development of the Detailed Design & Engineering within a Building Team (‘Bouwteam’) Agreement, and subsequently the execution of the construction of the International Meeting Facility.
What is the intended function of the new building on the ESTEC campus?
The building will be placed in a prominent position, visible from the ESTEC entrance, and will serve as the main representative building of the campus.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159