BZK-EA Carrying out load pressure measurements
The Ministry of the Interior and Kingdom Relations has entered into a contract with a service provider for the periodic carrying out of load pressure measurements. The assignment concerns measuring the pressure distribution on infrastructure components, such as roads, bridges, and tunnels, to ensure structural integrity and safety. The service provider must perform the measurements according to established standards and schedules, analyze the results, and report them to the ministry. Additionally, the supplier must make the collected data available for both prospective (dPi) and accountability (dVi) information, so that housing corporations can justify their investment intentions and financial figures. The procedure is public, promoting transparency and competition. The contracting authority expects a high level of technical expertise, accurate data processing, and timely reporting.
Services · Open · European procedure
01What is being requested
The Ministry of the Interior and Kingdom Relations has entered into a contract with a service provider for the periodic carrying out of load pressure measurements. The assignment concerns measuring the pressure distribution on infrastructure components, such as roads, bridges, and tunnels, to ensure structural integrity and safety. The service provider must perform the measurements according to established standards and schedules, analyze the results, and report them to the ministry. Additionally, the supplier must make the collected data available for both prospective (dPi) and accountability (dVi) information, so that housing corporations can justify their investment intentions and financial figures. The procedure is public, promoting transparency and competition. The contracting authority expects a high level of technical expertise, accurate data processing, and timely reporting.
We have entered into a contract with a service provider for the periodic carrying out of load pressure measurements. This involves two types of measurements: - dPi the prospective information, in which corporations indicate their investment intentions for the next five years and the effects thereof on their financial position; - dVi the accountability information, in which corporations account for the social housing and financial figures over the past year, including (if substantial changes are implemented therein) the auditor protocol.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What does the assignment for carrying out load pressure measurements entail?
What is the purpose of the dPi and dVi measurements?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 200K
€ 640K
€ 3,0 mln
Gegunde waarden in CPV 79 · diensten n=4949