RENDO, together with TenneT, is building a new 110/20kV substation at the RIEGMEER industrial estate in Hoogeveen. The first phase, planned for Q2 2027, requires three 110/20kV 90 MVA transformers providing an N-1 capacity of 180 MVA. The installation is designed with expansion options up to 360 MVA N-1 via two additional transformers. The tender focuses on delivery, installation, and aftercare, with an emphasis on quality, safety, and compliance with Dutch and European standards. Suppliers must demonstrate that they can guarantee the technical, logistical, and operational requirements, including collaboration with TenneT and the RENDO team.

Supplies · European procedure

European
Contracting authority
Contract type
Supplies
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Meppel
CharacteristicsCPV 31SuppliesEU tendertransformers110/20kV90MVA

01What is being requested

RENDO, together with TenneT, is building a new 110/20kV substation at the RIEGMEER industrial estate in Hoogeveen. The first phase, planned for Q2 2027, requires three 110/20kV 90 MVA transformers providing an N-1 capacity of 180 MVA. The installation is designed with expansion options up to 360 MVA N-1 via two additional transformers. The tender focuses on delivery, installation, and aftercare, with an emphasis on quality, safety, and compliance with Dutch and European standards. Suppliers must demonstrate that they can guarantee the technical, logistical, and operational requirements, including collaboration with TenneT and the RENDO team.

To facilitate the energy transition, RENDO and TenneT will realize a new 110/20kV substation near the city of Hoogeveen on the RIEGMEER industrial estate (hereinafter called the Project). The total project scope is given in attachment A. The realization and delivery of the first phase is planned for Q2 2027. In the first phase, a capacity of 180 MVA N-1 will be available based on three (3) power transformers of 110/20kV 90MVA with expansion options up to 360 MVA N-1, based on two (2) additional power transformers onwards.

31170000Supplies
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Fudura B.V.SME66
2Hitachi Energy The Netherlands BVSME65
3SÄCHSISCH-BAYERISCHE STARKSTROM-GERÄTEBAU GmbHUnknown63
4Kyte Powertech LimitedUnknown62
5GE Nederland B.V.SME61
6Croonwolter&dros B.V.SME60

05Tender documents

TN424558 - SF01 Vooraankondiging 20230802144251pdfAug 2, 2023 · 17 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the technical specification of the transformers for the RIEGMEER project?
The contract concerns the delivery of three (3) 110/20kV power transformers with a capacity of 90 MVA each.
What capacity will be realized in the first phase of the project?
In the first phase, a capacity of 180 MVA N-1 will be made available based on the three transformers.
Are there possibilities for expanding the transformer capacity?
Yes, there are expansion options up to 360 MVA N-1 through the later addition of two (2) extra power transformers.
When is the realization of the first phase planned?
The realization and delivery of the first phase is scheduled for the second quarter (Q2) of 2027.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 260K
median
€ 526K
p75
€ 1,4 mln
deze opdracht

Gegunde waarden in CPV 31 · leveringen n=168