The Rijksuniversiteit Groningen (RUG) manages approximately 500,000 m² of real estate, including lecture halls, offices, laboratories, and sports facilities. Due to frequent new construction, remodeling, and renovation, fire safety is often not fully documented. The fire department has indicated that not all drawings are in order and it is unclear whether the fire partitions meet the required fire resistance and are located in the correct positions. For Phase 1, the RUG is asking the market for advice on the optimal procurement strategy. The assignment focuses on identifying the current situation, determining the necessary measures, and drafting a realistic and market-oriented request for tender. The collaboration should contribute to a constructive approach, involving both contractors and fellow contracting authorities. Answers must be submitted via Mercell within two weeks of publication.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderfire-resistant partitionreal estateRijksuniversiteit Groningen

01What is being requested

The Rijksuniversiteit Groningen (RUG) manages approximately 500,000 m² of real estate, including lecture halls, offices, laboratories, and sports facilities. Due to frequent new construction, remodeling, and renovation, fire safety is often not fully documented. The fire department has indicated that not all drawings are in order and it is unclear whether the fire partitions meet the required fire resistance and are located in the correct positions. For Phase 1, the RUG is asking the market for advice on the optimal procurement strategy. The assignment focuses on identifying the current situation, determining the necessary measures, and drafting a realistic and market-oriented request for tender. The collaboration should contribute to a constructive approach, involving both contractors and fellow contracting authorities. Answers must be submitted via Mercell within two weeks of publication.

The Rijksuniversiteit Groningen (hereinafter: RUG) has approx. 500,000 m² of real estate. This includes, among other things, lecture halls, offices, sports facilities, laboratories, canteens, etc. This may potentially be expanded to approx. 550,000 m² in the coming years. It is a dynamic environment in which there is a high frequency of new construction, remodeling, and/or renovation. The fire department has pointed out that not all drawings for the various locations are in order; it is often unknown whether fire partitions have the required number of minutes of fire resistance and whether th

45343100Works
1Fire-resistant partitions

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME8734×
2Hegeman Bouw & Infra B.V.SME8631×
3Croonwolter&dros B.V.SME8525×
4Heijmans Utiliteit B.V.SME8427×
5Unica Installatietechniek B.V.SME7713×
6K_Dekker bouw & infra B.V.SME7622×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of Phase 1 of this project?
In Phase 1, the RUG is asking the market for advice on the optimal procurement strategy. The goal is to identify the current situation, determine necessary measures, and draft a realistic, market-oriented request for tender for constructive cooperation.
What is the reason for this assignment?
The fire department has indicated that not all drawings of the locations are in order. As a result, it is often unknown whether fire partitions have the required fire resistance and whether they are located in the correct positions within the buildings.
How should questions and answers for Phase 1 be submitted?
Interested parties, contractors, and fellow contracting authorities are invited to answer questions. The answers must be uploaded via the Mercell messaging module within two weeks of the publication of the questions.
What quantity of real estate is involved in the context of the assignment?
The RUG manages approximately 500,000 m² of real estate, consisting of, among other things, lecture halls, offices, sports facilities, laboratories, and canteens. This may potentially be expanded to approximately 550,000 m² in the coming years.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159