The Municipality of Súdwest-Fryslân intends to merge the existing field service locations in Bolsward, Heeg, and Sneek into a single main facility. The project includes the construction of offices, canteen, warehouses, workshops, garage, vehicle and work stables, and storage areas. The contracting authority has high sustainability objectives: a healthy working environment, an energy-positive building, circularity via biobased materials, and minimal environmental impact. To optimally utilize market knowledge, a construction team agreement will be concluded for the design and technical design phase (DO/TO) including pricing. Following approval of the TO and the budget, a realization agreement will follow; thereafter, the TO will be elaborated into a UO and realized. The assignment requires an integrated approach, knowledge of sustainable construction, experience with construction team agreements, and the ability to realize an energy-positive, circular building.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderconstruction teamhousingfield services

01What is being requested

The Municipality of Súdwest-Fryslân intends to merge the existing field service locations in Bolsward, Heeg, and Sneek into a single main facility. The project includes the construction of offices, canteen, warehouses, workshops, garage, vehicle and work stables, and storage areas. The contracting authority has high sustainability objectives: a healthy working environment, an energy-positive building, circularity via biobased materials, and minimal environmental impact. To optimally utilize market knowledge, a construction team agreement will be concluded for the design and technical design phase (DO/TO) including pricing. Following approval of the TO and the budget, a realization agreement will follow; thereafter, the TO will be elaborated into a UO and realized. The assignment requires an integrated approach, knowledge of sustainable construction, experience with construction team agreements, and the ability to realize an energy-positive, circular building.

The existing housing for the field services in Bolsward, Heeg, and Sneek will be merged into a single location. Completely new facilities and accommodations must be realized here, such as offices, canteen, warehouses, workshops, garage, work and vehicle stables, and storage, among others. In addition to creating a new functional (main) field service facility, the contracting authority has high ambitions regarding sustainability, including a healthy working environment, energy-positive, circularity through the use of biobased materials, and limiting the environmental impact of the building. The

Works

02Outcome

Awarded

Bouwgroep Dijkstra Draisma

Bidders
3

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Bouwgroep Dijkstra Draisma potentialUnknown40
2Van Pelt Architecten B.V. potentialSME36
3LIAG architecten en bouwadviseurs potentialUnknown33
4Van Wijnen Gorredijk B.V. potentialSME31
5Harwig B.V. potentialSME31
6HEYDAY Facility Management B.V. potentialSME31

06Tender documents

TN401337 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20231201111733pdfDec 3, 2023 · 10 KB
Nota van inlichtingen 2023-04-11-1pdfApr 11, 2023 · 17 KB
Bijlagenboek Selectie SWF BD Bouwteampartner 230317docxMar 18, 2023 · 488 KB
Selectieleidraad SWF BD 230317pdfMar 18, 2023 · 475 KB
Bijlage 7 Algemene voorwaarden Werken gemeente SWFpdfMar 18, 2023 · 79 KB
TN401337 - SF02 Aankondiging van een opdracht 20230316151721pdfMar 18, 2023 · 32 KB
Bijlage 2 Eigen verklaring SWF Selectie BD BouwteampartnerpdfMar 18, 2023 · 2098 KB
TN401337 - SF01 Vooraankondiging 20230302133650pdfMar 4, 2023 · 17 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the goal of this project for the field services?
The project involves merging the existing field service locations in Bolsward, Heeg, and Sneek into one new main facility with facilities such as offices, canteen, warehouses, workshops, garage, and stables.
What sustainability ambitions are attached to the new construction?
The contracting authority sets high ambitions for a healthy working environment, an energy-positive building, circularity through the use of biobased materials, and limiting the environmental impact of the building.
How is the contractual structure of the assignment organized?
A construction team agreement is used for the DO and TO phase, including pricing. After approval of the TO and the budget, a realization agreement is concluded, after which the TO is elaborated into a UO for realization.