Construction Team Partner Housing Field Services Bolsward
The Municipality of Súdwest-Fryslân intends to merge the existing field service locations in Bolsward, Heeg, and Sneek into a single main facility. The project includes the construction of offices, canteen, warehouses, workshops, garage, vehicle and work stables, and storage areas. The contracting authority has high sustainability objectives: a healthy working environment, an energy-positive building, circularity via biobased materials, and minimal environmental impact. To optimally utilize market knowledge, a construction team agreement will be concluded for the design and technical design phase (DO/TO) including pricing. Following approval of the TO and the budget, a realization agreement will follow; thereafter, the TO will be elaborated into a UO and realized. The assignment requires an integrated approach, knowledge of sustainable construction, experience with construction team agreements, and the ability to realize an energy-positive, circular building.
Works · Restricted · European procedure
01What is being requested
The Municipality of Súdwest-Fryslân intends to merge the existing field service locations in Bolsward, Heeg, and Sneek into a single main facility. The project includes the construction of offices, canteen, warehouses, workshops, garage, vehicle and work stables, and storage areas. The contracting authority has high sustainability objectives: a healthy working environment, an energy-positive building, circularity via biobased materials, and minimal environmental impact. To optimally utilize market knowledge, a construction team agreement will be concluded for the design and technical design phase (DO/TO) including pricing. Following approval of the TO and the budget, a realization agreement will follow; thereafter, the TO will be elaborated into a UO and realized. The assignment requires an integrated approach, knowledge of sustainable construction, experience with construction team agreements, and the ability to realize an energy-positive, circular building.
The existing housing for the field services in Bolsward, Heeg, and Sneek will be merged into a single location. Completely new facilities and accommodations must be realized here, such as offices, canteen, warehouses, workshops, garage, work and vehicle stables, and storage, among others. In addition to creating a new functional (main) field service facility, the contracting authority has high ambitions regarding sustainability, including a healthy working environment, energy-positive, circularity through the use of biobased materials, and limiting the environmental impact of the building. The
02Outcome
Bouwgroep Dijkstra Draisma
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the goal of this project for the field services?
What sustainability ambitions are attached to the new construction?
How is the contractual structure of the assignment organized?
Automatically compiled from the official tender data and documents.