AwardedWorksEuropeanRestricted

Construction Team Assignment Underpass Trekvlietbrug

Gemeente Den Haag · Restricted · 1 lots · 295713
Type
Works
45000000
Estimated value
€ 272K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Den Haag intends to realize a grade-separated underpass beneath the Trekvlietbrug via the No-Regretpakket. This underpass is intended for cyclists and pedestrians and closes a missing link in the Trekfietstracé (star cycling route) in Binckhorst Noord. The project improves the safety and flow of slow-moving traffic on the Mercuriusweg, eliminates a major barrier, and forms a crucial connection between the northern and southern zones of the future Waterfrontpark. The underpass must comply with Dutch standards for accessibility, safety, and sustainability, and must be integrated into a 26-meter wide zone on the east bank of the Trekvliet. Additionally, the design must take into account water drainage, minimal traffic disruption during construction, and timely delivery within the No-Regret framework.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€272,420
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Den Haag
CharacteristicsCPV 45WorksEU tenderunderpassTrekvlietbrugcyclists

01What is being requested

The Municipality of Den Haag intends to realize a grade-separated underpass beneath the Trekvlietbrug via the No-Regretpakket. This underpass is intended for cyclists and pedestrians and closes a missing link in the Trekfietstracé (star cycling route) in Binckhorst Noord. The project improves the safety and flow of slow-moving traffic on the Mercuriusweg, eliminates a major barrier, and forms a crucial connection between the northern and southern zones of the future Waterfrontpark. The underpass must comply with Dutch standards for accessibility, safety, and sustainability, and must be integrated into a 26-meter wide zone on the east bank of the Trekvliet. Additionally, the design must take into account water drainage, minimal traffic disruption during construction, and timely delivery within the No-Regret framework.

One of the measures from the No-Regretpakket is the realization of a grade-separated intersection beneath the Trekvlietbrug for slow-moving traffic, namely the Trekvlietbrug underpass for cyclists and pedestrians. The underpass ensures that a missing link on the Trekfietstracé (a star cycling route) in Binckhorst Noord is resolved. With the new underpass, cyclists and pedestrians can safely cross the Mercuriusweg without hindrance or delay. This removes a major barrier for slow-moving traffic in this part of the Binckhorst. The underpass also forms an important link in the future Waterfrontpar

45000000Works
1Lot 1

02Outcome

Awarded

BAM Infra B.V.

Award value
€272,420
Bidders
4

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME10077×
2KWS Infra B.V.SME9692×
3Heijmans Infra B.V.SME9565×
4Van Gelder BVSME9553×
5Dura Vermeer Infra Regionale Projecten BVSME9458×
6Hegeman Bouw & Infra B.V.SME9331×

06Tender documents

TN407626 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20231018144208pdfOct 19, 2023 · 9 KB
23.080 - 2de Nota van Inlichtingen 1.0pdfJun 7, 2023 · 186 KB
23.080 - Bijlage 3, 5 en 6 in worddocxMay 17, 2023 · 47 KB
23.080 - Nota van Inlichtingen 1.0pdfMay 17, 2023 · 238 KB
TN407626 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20230517141814pdfMay 17, 2023 · 15 KB
23.080 - Bijlage 8 SelectiecriteriumdocxMay 17, 2023 · 39 KB
23.080 - Aangepaste Selectieleidraad incl. BijlagenzipMay 17, 2023 · 763 KB
23.080 - Selectieleidraad Onderdoorgang Trekvlietbrug 1.1pdfMay 17, 2023 · 748 KB
23.080 - Bijlage 7 Referentieverklaringen 1 tm 3docxMay 17, 2023 · 45 KB
23.080 - Bijlage 9 ontwerprapportage VO onderdoorgang Trekvlietbrug 2022.05.16pdfApr 22, 2023 · 20308 KB
TN407626 - SF02 Aankondiging van een opdracht 20230420162949pdfApr 22, 2023 · 32 KB
23.080 - Bijlage 4 Uniform Europees AanbestedingsdocumentpdfApr 22, 2023 · 2097 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the objective of the assignment for the Trekvlietbrug underpass?
The assignment involves the realization of a grade-separated intersection beneath the Trekvlietbrug for cyclists and pedestrians. This resolves a missing link in the Trekfietstracé (star cycling route) in Binckhorst Noord and ensures a safe crossing of the Mercuriusweg.
What function does the underpass serve within the area development?
The underpass forms an important link in the future Waterfrontpark. It connects the two zones of the park, located to the north and south of the Trekvlietbrug, which are situated in a 26-meter wide zone on the east bank.
What is the intended impact on the traffic situation in Binckhorst Noord?
Through the realization of the underpass, a major barrier for slow-moving traffic in this part of the Binckhorst will be removed. Cyclists and pedestrians can safely cross the Mercuriusweg without hindrance or delay.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159