AwardedWorksEuropeanRestricted

Construction team contractor new build Laborijn

Laborijn · Restricted · 1 lots · 267040
Type
Works
45000000
Estimated value
€ 10M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Laborijn is looking for a construction team contractor for a new build project. The contractor must participate in a construction team, providing innovative ideas and advice to realize a highly manufacturable, low-maintenance design within the budget. Following the design phase, the contractor will enter into a separate realization and maintenance agreement for 10 years after commissioning. The procedure is non-public and focuses on an integrated approach to design, construction, and maintenance.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€10,000,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Doetinchem
CharacteristicsCPV 45WorksEU tenderconstruction teamnew buildmaintenance

01What is being requested

Laborijn is looking for a construction team contractor for a new build project. The contractor must participate in a construction team, providing innovative ideas and advice to realize a highly manufacturable, low-maintenance design within the budget. Following the design phase, the contractor will enter into a separate realization and maintenance agreement for 10 years after commissioning. The procedure is non-public and focuses on an integrated approach to design, construction, and maintenance.

Laborijn requires new housing in the form of new construction and is seeking a construction team contractor that: 1. Participates in the construction team and provides ideas, proposals, suggestions, and advice that contribute to a highly manufacturable and easy-to-maintain design that fits within (budget) frameworks (for this purpose, the contractor and the Contracting Authority shall enter into a construction team agreement) 2. Ensures the realization of the new build (building and installation technical realization) and the maintenance of the new build for a period of 10 years after commiss

45000000Works
1Lot 1

02Outcome

Awarded

KlaassenGroep BV

Award value
€10,000,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Arcadis Nederland B.V.SME9534×
2BAM Infra B.V.SME9578×
3KWS Infra B.V.SME9492×
4Combinatie Heijmans - SWARCOUnknown9473×
5BAM Bouw en Techniek bvSME9434×
6Heijmans Utiliteit B.V.SME9427×

06Tender documents

TN368836 - SF03 Aankondiging van een gegunde opdracht 20230220164212pdfFeb 22, 2023 · 26 KB
Nota van Inlichtingen Selectieleidraad Bouwteamaannemer d.d. 23-08-2022pdfAug 23, 2022 · 421 KB
Bijlage 3 Visie + ruimtebehoefte LaborijnpdfJul 13, 2022 · 1904 KB
220630 Selectieleidraad Bouwteamaannemer nieuwbouw LaborijnpdfJul 13, 2022 · 1300 KB
Bijlage 2 Formulier Gegevens ReferentieprojectdocxJul 13, 2022 · 70 KB
TN368836 - SF02 Aankondiging van een opdracht 20220711140837pdfJul 13, 2022 · 29 KB
Bijlage 1 Uniform Europees AanbestedingsdocumentpdfJul 13, 2022 · 2097 KB

07Legal themes that may be relevant here

08Frequently asked questions

What does the role of the construction team contractor entail in this project?
The contractor participates in the construction team and provides ideas, proposals, suggestions, and advice. The goal is to realize a highly manufacturable and easy-to-maintain design that fits within the budget frameworks.
What works are expected after the design phase?
After the successful completion of the design phase, a separate agreement will be concluded for the building and installation technical realization of the new build, as well as the maintenance of the new build.
What is the duration of the maintenance agreement?
The contractor is responsible for the maintenance of the new build for a period of 10 years after commissioning.
How is the cooperation during the design phase arranged?
For participation in the construction team and the contribution to the design, the contractor and the client shall enter into a construction team agreement.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 10 mln

Gegunde waarden in CPV 45 · werken n=3159