ClosedWorksEuropeanRestrictedGreen

Construction team Roman Museum de Thermen

Gemeente Heerlen · Restricted · 1 lots · 320442
Type
Works
45000000
Estimated value
€ 21M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Heerlen is seeking a construction team for a new museum building surrounding the Roman bathhouse, a national monument. The current building does not meet the climate and security requirements necessary to preserve the bathhouse and the collections. The new building must meet modern museum standards for climate control, security, interior design, management, and presentation, and must also serve as an iconic part of the Roman quarter and the city center. The procurement is non-public, aimed at a limited number of selected partners. The assignment requires expertise in monument conservation, museum architecture, climate technology, and security systems, with a strong focus on sustainability and accessibility.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€21,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPmuseumRomanthermae

01What is being requested

The Municipality of Heerlen is seeking a construction team for a new museum building surrounding the Roman bathhouse, a national monument. The current building does not meet the climate and security requirements necessary to preserve the bathhouse and the collections. The new building must meet modern museum standards for climate control, security, interior design, management, and presentation, and must also serve as an iconic part of the Roman quarter and the city center. The procurement is non-public, aimed at a limited number of selected partners. The assignment requires expertise in monument conservation, museum architecture, climate technology, and security systems, with a strong focus on sustainability and accessibility.

The city of Heerlen aims to create a new museum building for its Roman bathhouse, which should also become an icon for the Roman quarter and the city center of Heerlen. The current museum building no longer meets the climate requirements to properly preserve the Roman bathhouse (national monument). To provide shelter for the museum's collections, including the bathhouse, and for loans from renowned museums, a new museum building is required that meets contemporary museum standards for climate, security, interior design, management, and presentation.

45000000€ 21MWorks
1construction team partner/contractor

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€21,000,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME9127×
2BINX Smartility B.V.SME9127×
3BAM Bouw en Techniek bvSME9034×
4BAM Infra B.V.SME9077×
5Croonwolter&dros B.V.SME9025×
6Combinatie Heijmans - SWARCOUnknown8973×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of constructing the new museum building?
The new building must meet contemporary museum standards for climate, security, interior design, management, and presentation in order to house the collections and the Roman bathhouse (national monument).
What expertise is required for this project?
The assignment requires expertise in monument conservation, museum architecture, climate technology, and security systems, with a strong focus on sustainability and accessibility.
What components must the construction team consist of?
The construction team must consist of a contractor, a demolition contractor (whether or not as a subcontractor), and an installer for water (W) and electricity (E).
What form of contracting is applied?
The assignment is executed via a construction team agreement, followed by a construction contract.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 21 mln

Gegunde waarden in CPV 45 · werken n=3159