ClosedWorksEuropeanOpen

Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag

Gemeente Den Haag · Open · 1 lots · 374627
Type
Works
45221119
Estimated value
€ 39M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns a construction team phase in preparation for the renovation of the Trekvlietbrug (and later the Laakbrug, Leeghwaterbrug and Calandbrug) in Den Haag. The assignment is limited to participation in the design process, the preparation of a final design and specification (UAV 2012), and the submission of input for planning, risk management, nuisance reduction and budgeting. The construction team agreement starts in Q3 2025.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€38,526,928
estimated value
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

This tender concerns a construction team phase in preparation for the renovation of the Trekvlietbrug (and later the Laakbrug, Leeghwaterbrug and Calandbrug) in Den Haag. The assignment is limited to participation in the design process, the preparation of a final design and specification (UAV 2012), and the submission of input for planning, risk management, nuisance reduction and budgeting. The construction team agreement starts in Q3 2025.

The Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug are four movable bridges along the Neherkade in Den Haag. The bridges form important links in the accessibility of the Laak district and the Laakhaven. Research has shown that these four movable bridges must be renovated. The bridges are outdated and show various defects. The contracting authority wishes to extend the remaining service life of these bridges by at least 30 years. The Municipality of Den Haag intends to prepare and execute the renovation of the four movable bridges step-by-step in a construction team collaboration with o

45221119€ 39MWorks
1Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag€38,526,928

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€38,526,928

04Likely competitors

#Likely bidderFitWins
1Witteveen+Bos Raadgevende ingenieurs B.V.SME10063×
2Movares Nederland B.V.SME10049×
3KWS Infra B.V.SME10092×
4BAM Infra B.V.SME10077×
5Dura Vermeer Infra Regionale Projecten BVSME10058×
6Iv-Infra B.V.SME10022×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the construction team phase for the bridges at the Neherkade?
The construction team phase serves as preparation for the renovation of the Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug. The contractor participates in the design process and provides input for the planning, the risk dossier, nuisance reduction and an open and transparent budget.
What is the scope of the first assignment within this project?
The agreement is initially limited to the construction team phase in preparation for the renovation of the Trekvlietbrug. After this phase, an execution agreement for the renovation of the Trekvlietbrug can be awarded based on the prepared specification.
Are there options for the renovation of the other three bridges?
Yes, options are included for a construction team collaboration for the preparation and execution of the renovation of the Laakbrug, Leeghwaterbrug and Calandbrug. Awarding these is dependent on the quality delivered, the collaboration and sufficient budget.
Which technical frameworks are used for the design and specification?
The contractor provides works for the purpose of preparing the final design and a specification based on UAV 2012. An already contracted engineering firm supports the design process and prepares the final design.
What is the intended commencement date of the construction team agreement?
The commencement date of the construction team agreement is foreseen at the beginning of Q3 2025.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 39 mln

Gegunde waarden in CPV 45 · werken n=3159