Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag
This tender concerns a construction team phase in preparation for the renovation of the Trekvlietbrug (and later the Laakbrug, Leeghwaterbrug and Calandbrug) in Den Haag. The assignment is limited to participation in the design process, the preparation of a final design and specification (UAV 2012), and the submission of input for planning, risk management, nuisance reduction and budgeting. The construction team agreement starts in Q3 2025.
Works · Open · European procedure
01What is being requested
This tender concerns a construction team phase in preparation for the renovation of the Trekvlietbrug (and later the Laakbrug, Leeghwaterbrug and Calandbrug) in Den Haag. The assignment is limited to participation in the design process, the preparation of a final design and specification (UAV 2012), and the submission of input for planning, risk management, nuisance reduction and budgeting. The construction team agreement starts in Q3 2025.
The Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug are four movable bridges along the Neherkade in Den Haag. The bridges form important links in the accessibility of the Laak district and the Laakhaven. Research has shown that these four movable bridges must be renovated. The bridges are outdated and show various defects. The contracting authority wishes to extend the remaining service life of these bridges by at least 30 years. The Municipality of Den Haag intends to prepare and execute the renovation of the four movable bridges step-by-step in a construction team collaboration with o
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the construction team phase for the bridges at the Neherkade?
What is the scope of the first assignment within this project?
Are there options for the renovation of the other three bridges?
Which technical frameworks are used for the design and specification?
What is the intended commencement date of the construction team agreement?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159