Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag

Gemeente Den Haag · 1 lots · 367942
Type
Works
45221119
Estimated value
€ 39M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This project concerns the construction team phase for the renovation of four movable bridges (Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug) along the Neherkade in Den Haag. The Municipality of Den Haag wishes to extend the remaining service life of these bridges by at least 30 years and has linked an engineering firm to the design process. The tender is aimed at an executing party that can participate in the design, planning, and risk management. In the first phase, only the Trekvlietbrug is part of the programme; further bridges may be added following successful cooperation and available budgets. **Key points** - **Objective**: Prepare construction team phase for Trekvlietbrug; possible expansion to other bridges. - **Assessment**: Disclosure options for planning, nuisance reduction, budget transparency. - **Procedure**: Work, type unknown. - **CPV**: 45221119 (Bridge renovation). - **Location**: NUTS NL332 (Den Haag). - **Start**: Mid-March 2025; signing of construction team agreement beginning Q3 2025.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
€38,500,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

This project concerns the construction team phase for the renovation of four movable bridges (Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug) along the Neherkade in Den Haag. The Municipality of Den Haag wishes to extend the remaining service life of these bridges by at least 30 years and has linked an engineering firm to the design process. The tender is aimed at an executing party that can participate in the design, planning, and risk management. In the first phase, only the Trekvlietbrug is part of the programme; further bridges may be added following successful cooperation and available budgets. **Key points** - **Objective**: Prepare construction team phase for Trekvlietbrug; possible expansion to other bridges. - **Assessment**: Disclosure options for planning, nuisance reduction, budget transparency. - **Procedure**: Work, type unknown. - **CPV**: 45221119 (Bridge renovation). - **Location**: NUTS NL332 (Den Haag). - **Start**: Mid-March 2025; signing of construction team agreement beginning Q3 2025.

The Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug are four movable bridges along the Neherkade in Den Haag. The bridges form important links in the accessibility of the Laak district and the Laakhaven. Research has shown that these four movable bridges must be renovated. The bridges are outdated and show various defects. The contracting authority wishes to extend the remaining service life of these bridges by at least 30 years. The Municipality of Den Haag intends to prepare and execute the renovation of the four movable bridges step-by-step in a construction team collaboration with

45221119€ 39MWorks
1Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag€38,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€38,500,000

04Likely competitors

#Likely bidderFitWins
1Movares Nederland B.V.SME10049×
2Arcadis Nederland B.V.SME99116×
3Witteveen+Bos Raadgevende ingenieurs B.V.SME9963×
4KWS Infra B.V.SME9992×
5BAM Infra B.V.SME9977×
6Dura Vermeer Infra Regionale Projecten BVSME9958×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the renovation of the movable bridges?
The objective is to extend the remaining service life of the Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug by at least 30 years.
What does the construction team collaboration entail for the executing party?
The executing party participates in the design process and provides works for the purpose of the final design and a specification based on UAV 2012. Input is also requested for the planning, the risk dossier, nuisance reduction, and a transparent budget.
Which bridges are initially treated?
In the first instance, the agreement is limited to the construction team phase in preparation for the renovation of the Trekvlietbrug. Options are included for the renovation of the Laakbrug, Leeghwaterbrug and Calandbrug.
Under which conditions can the remaining bridges be added?
Addition of the Laakbrug, Leeghwaterbrug and Calandbrug is dependent on the quality delivered in previous assignments, the course of the cooperation, and the availability of sufficient budget.
What is the expected schedule for the construction team agreement?
The start of the procurement procedure is planned for mid-March 2025 and the commencement date of the construction team agreement is planned for the beginning of Q3 2025.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 39 mln

Gegunde waarden in CPV 45 · werken n=3159