Construction team renovation 4 movable bridges: Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug in Den Haag
This project concerns the construction team phase for the renovation of four movable bridges (Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug) along the Neherkade in Den Haag. The Municipality of Den Haag wishes to extend the remaining service life of these bridges by at least 30 years and has linked an engineering firm to the design process. The tender is aimed at an executing party that can participate in the design, planning, and risk management. In the first phase, only the Trekvlietbrug is part of the programme; further bridges may be added following successful cooperation and available budgets. **Key points** - **Objective**: Prepare construction team phase for Trekvlietbrug; possible expansion to other bridges. - **Assessment**: Disclosure options for planning, nuisance reduction, budget transparency. - **Procedure**: Work, type unknown. - **CPV**: 45221119 (Bridge renovation). - **Location**: NUTS NL332 (Den Haag). - **Start**: Mid-March 2025; signing of construction team agreement beginning Q3 2025.
Works · European procedure
01What is being requested
This project concerns the construction team phase for the renovation of four movable bridges (Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug) along the Neherkade in Den Haag. The Municipality of Den Haag wishes to extend the remaining service life of these bridges by at least 30 years and has linked an engineering firm to the design process. The tender is aimed at an executing party that can participate in the design, planning, and risk management. In the first phase, only the Trekvlietbrug is part of the programme; further bridges may be added following successful cooperation and available budgets. **Key points** - **Objective**: Prepare construction team phase for Trekvlietbrug; possible expansion to other bridges. - **Assessment**: Disclosure options for planning, nuisance reduction, budget transparency. - **Procedure**: Work, type unknown. - **CPV**: 45221119 (Bridge renovation). - **Location**: NUTS NL332 (Den Haag). - **Start**: Mid-March 2025; signing of construction team agreement beginning Q3 2025.
The Trekvlietbrug, Laakbrug, Leeghwaterbrug and Calandbrug are four movable bridges along the Neherkade in Den Haag. The bridges form important links in the accessibility of the Laak district and the Laakhaven. Research has shown that these four movable bridges must be renovated. The bridges are outdated and show various defects. The contracting authority wishes to extend the remaining service life of these bridges by at least 30 years. The Municipality of Den Haag intends to prepare and execute the renovation of the four movable bridges step-by-step in a construction team collaboration with
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the renovation of the movable bridges?
What does the construction team collaboration entail for the executing party?
Which bridges are initially treated?
Under which conditions can the remaining bridges be added?
What is the expected schedule for the construction team agreement?
Automatically compiled from the official tender data and documents.