ClosedWorksEuropeanRestricted

Construction team for the realization of UK Terminal at Amsterdam Centraal

NS Groep N.V. · Restricted · 1 lots · 325296
Type
Works
45210000
Estimated value
€ 11M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

NS Groep N.V. is seeking a construction team for the realization of the UK Terminal at Amsterdam Centraal. The project concerns an extensive works contract in which the construction team is responsible for the design, construction, finishing, and delivery of the terminal. The works include civil, structural, MEP, and interior installations, including integration with existing railway infrastructure and minimizing disruptions to daily train services. The construction team must work closely with NS, the Municipality of Amsterdam, and other stakeholders, and must comply with strict requirements regarding safety, accessibility, sustainability, and quality. The procedure is non-public, meaning a limited number of certified companies will be invited. The contracting authority expects clear planning, performance-based milestones, robust risk management, and transparent cost management. References, financial capacity, and a proven safety record are essential.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€11,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderUK TerminalAmsterdam Centraalconstruction team

01What is being requested

NS Groep N.V. is seeking a construction team for the realization of the UK Terminal at Amsterdam Centraal. The project concerns an extensive works contract in which the construction team is responsible for the design, construction, finishing, and delivery of the terminal. The works include civil, structural, MEP, and interior installations, including integration with existing railway infrastructure and minimizing disruptions to daily train services. The construction team must work closely with NS, the Municipality of Amsterdam, and other stakeholders, and must comply with strict requirements regarding safety, accessibility, sustainability, and quality. The procedure is non-public, meaning a limited number of certified companies will be invited. The contracting authority expects clear planning, performance-based milestones, robust risk management, and transparent cost management. References, financial capacity, and a proven safety record are essential.

Construction team for the realization of UK Terminal at Amsterdam Centraal

45210000€ 11MWorks
1Construction team for the realization of UK Terminal at Amsterdam Centraal€11,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€11,000,000

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9577×
2KWS Infra B.V.SME9292×
3Dura Vermeer Infra Regionale Projecten BVSME9158×
4Van Gelder BVSME9153×
5Boskalis Nederland B.V.SME9069×
6ENGIE Infra & Mobility B.V.SME9069×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of work for the construction team?
The construction team is responsible for the design, construction, finishing, and delivery of the UK Terminal. The works include civil, structural, MEP, and interior installations, including integration with the existing railway infrastructure.
Which operational requirements must the construction team meet during realization?
The construction team must minimize disruptions to daily train services and work closely with NS, the Municipality of Amsterdam, and other stakeholders. Strict requirements apply regarding safety, accessibility, sustainability, and quality.
What qualitative aspects are expected from the contractor?
The contracting authority expects clear planning, performance-based milestones, robust risk management, and transparent cost management. References, financial capacity, and a proven safety record are essential.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 11 mln

Gegunde waarden in CPV 45 · werken n=3159