Construction team realization UK Terminal at Amsterdam Centraal
NS Groep N.V. is seeking a contractor for the realization of the UK Terminal in the Amstelpassage at Amsterdam Centraal. The assignment consists of two phases: a design phase (Q4 2023 – Q1 2024) in which the contractor develops the DO+ (Design Output) into a UO (Uitvoeringsonderdeel) within a construction team framework, and a realization phase that follows a cost agreement. The DO+ has already been created in Revit, and the architect holds the design responsibility. The contractor must have experience with construction teams, Revit, and the preparation of UO’s for complex infrastructure projects. The final execution of the terminal will take place once the costs have been agreed upon. The procedure is non-public, meaning the procurement is targeted at a limited number of selected parties.
Works · Restricted · European procedure
01What is being requested
NS Groep N.V. is seeking a contractor for the realization of the UK Terminal in the Amstelpassage at Amsterdam Centraal. The assignment consists of two phases: a design phase (Q4 2023 – Q1 2024) in which the contractor develops the DO+ (Design Output) into a UO (Uitvoeringsonderdeel) within a construction team framework, and a realization phase that follows a cost agreement. The DO+ has already been created in Revit, and the architect holds the design responsibility. The contractor must have experience with construction teams, Revit, and the preparation of UO’s for complex infrastructure projects. The final execution of the terminal will take place once the costs have been agreed upon. The procedure is non-public, meaning the procurement is targeted at a limited number of selected parties.
We are looking for a contractor to realize the UK Terminal in the Amstelpassage at Amsterdam Centraal. During the design phase (Q4 2023 and Q1 2024), the contractor will develop the DO+ into a UO within a construction team framework. The DO+ is created in Revit, and the architect holds the design responsibility for this DO+. If agreement is reached regarding the realization costs, the contractor will be commissioned to execute the realization phase.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What does the design phase of this project entail?
Who bears the responsibility for the design (DO+)?
When will the realization phase of the UK Terminal start?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159