AwardedWorksEuropeanRestricted

Construction team project 'Verzelfstandiging RWZI in Beverwijk'

Hoogheemraadschap Hollands Noorderkwartier · Restricted · 1 lots · 191617
Type
Works
45252140
Estimated value
€ 435K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Hoogheemraadschap Hollands Noorderkwartier is looking for a construction team for the project ‘Verzelfstandiging RWZI in Beverwijk’. The assignment concerns the sustainable and efficient decoupling of the ‘umbilical cord’ connecting the SDI (Stroom- en Dijkinventarisatie) and the RWZI Beverwijk. The works must ensure the continuity of sludge processing at HHNK and maintain the optimal operation of the RWZI. The procedure is non-public and focuses on a specialized contractor with experience in water treatment plants, infrastructure, and sustainable separation solutions.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
€435,000
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Heerhugowaard
CharacteristicsCPV 45WorksEU tenderdecouplingsludge processingRWZI

01What is being requested

Hoogheemraadschap Hollands Noorderkwartier is looking for a construction team for the project ‘Verzelfstandiging RWZI in Beverwijk’. The assignment concerns the sustainable and efficient decoupling of the ‘umbilical cord’ connecting the SDI (Stroom- en Dijkinventarisatie) and the RWZI Beverwijk. The works must ensure the continuity of sludge processing at HHNK and maintain the optimal operation of the RWZI. The procedure is non-public and focuses on a specialized contractor with experience in water treatment plants, infrastructure, and sustainable separation solutions.

The SDI site is located on the other side of the road, opposite the RWZI Beverwijk. Both installations (SDI and RWZI) are connected to each other through various processes and interactions (umbilical cord). As preparation for the closure of the SDI, an efficient and sustainable decoupling of this umbilical cord must be realized. In this regard, ensuring the continuity of HHNK sludge processing and maintaining optimal operation of RWZI Beverwijk is of crucial importance. For more information, see the market consultation document.

45252140Works
1Lot 1

02Outcome

Awarded

GMB Civiel B.V.

Award value
€435,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME10065×
2ENGIE Infra & Mobility B.V.SME9969×
3Boskalis Nederland B.V.SME9869×
4Dura Vermeer Infra Regionale Projecten BVSME9858×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×
6KWS Infra B.V.SME9792×

06Tender documents

TN260502 - SF03 Aankondiging van een gegunde opdracht 20201109102229pdfNov 9, 2020 · 29 KB
Nota van Inlichtingen 2020-05-06-1pdfMay 6, 2020 · 48 KB
Bijlage 4_Opgave gegevens Financieel Economische DraagkrachtxlsxApr 2, 2020 · 68 KB
uea_260502_20200401125937pdfApr 2, 2020 · 33 KB
uea_260502_20200401125937xmlApr 2, 2020 · 126 KB
Bijlage 3 - Modelformulier Referentiewerken 1.0docxApr 2, 2020 · 64 KB
Selectieleidraad niet-openbaar werken (UAV-GC) 1.0pdfApr 2, 2020 · 492 KB
Bijlage 2_Aanvullende eigen verklaring aanbesteding ontvlechting RWZI BeverwijkpdfApr 2, 2020 · 373 KB
TN260502 - SF02 Aankondiging van een opdracht 20200402144709pdfApr 2, 2020 · 32 KB
Bijlage 6 Marktconsulatie eindverslagpdfApr 2, 2020 · 194 KB
Bijlage 1 AanmeldingsformulierpdfApr 2, 2020 · 1082 KB

07Legal themes that may be relevant here

08Frequently asked questions

Which operational continuity must be ensured during the works?
During the decoupling, ensuring the continuity of sludge processing at HHNK and maintaining optimal operation of RWZI Beverwijk is of crucial importance.
What is the nature of the works regarding the installations?
The works focus on decoupling the connection between the SDI and the RWZI Beverwijk, where the installations are located on opposite sides of the road.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 435K

Gegunde waarden in CPV 45 · werken n=3159