Construction Team Planned Maintenance Hartelcorridor
The Province of Zuid-Holland intends to form a construction team to carry out planned maintenance on the Hartelcorridor. The corridor connects Rotterdam Botlek with Spijkenisse and includes various civil engineering structures, including a traffic bridge, a storm surge barrier, a lock, and a bicycle bridge. The works include repair of civil engineering structures, replacement of moving parts, conservation, replacement of falls, electrotechnical installations, barrier tree cabinets, CE marking, sinkers, and public lighting fixtures. The contract is non-public and aimed at a collaboration with one or more market parties. The province is looking for a partner with experience in complex infrastructure maintenance, water and shipping structures, and who can comply with the safety and environmental standards applicable to the Hartelcorridor.
Works · Restricted · European procedure
01What is being requested
The Province of Zuid-Holland intends to form a construction team to carry out planned maintenance on the Hartelcorridor. The corridor connects Rotterdam Botlek with Spijkenisse and includes various civil engineering structures, including a traffic bridge, a storm surge barrier, a lock, and a bicycle bridge. The works include repair of civil engineering structures, replacement of moving parts, conservation, replacement of falls, electrotechnical installations, barrier tree cabinets, CE marking, sinkers, and public lighting fixtures. The contract is non-public and aimed at a collaboration with one or more market parties. The province is looking for a partner with experience in complex infrastructure maintenance, water and shipping structures, and who can comply with the safety and environmental standards applicable to the Hartelcorridor.
The Province of Zuid-Holland intends to award a contract for the execution of planned maintenance on the Hartelcorridor. The Province of Zuid-Holland wishes to enter into a partnership with one or more market parties in the form of a construction team (ECI model/collaborative model). The Hartelcorridor runs along the Hartel complex. This is a connection between Rotterdam Botlek and Spijkenisse via the Hartelkanaal and the Zoetwaterkanaal. To the west of the traffic bridge lies the Hartelkering, a storm surge barrier. To the east of the bridge lies a lock, the Grote Hartelsluis. Between the Ha
02Outcome
Dura Vermeer Infra Landelijke Projecten BV
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the nature of the works for the Hartelcorridor?
Which objects are covered under the maintenance contract?
In what form will the contract be executed?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159