AwardedWorksEuropeanRestricted

Construction Team Planned Maintenance Hartelcorridor

provincie Zuid-Holland · Restricted · 264786
Type
Works
45221119
Estimated value
€ 24M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Province of Zuid-Holland intends to form a construction team to carry out planned maintenance on the Hartelcorridor. The corridor connects Rotterdam Botlek with Spijkenisse and includes various civil engineering structures, including a traffic bridge, a storm surge barrier, a lock, and a bicycle bridge. The works include repair of civil engineering structures, replacement of moving parts, conservation, replacement of falls, electrotechnical installations, barrier tree cabinets, CE marking, sinkers, and public lighting fixtures. The contract is non-public and aimed at a collaboration with one or more market parties. The province is looking for a partner with experience in complex infrastructure maintenance, water and shipping structures, and who can comply with the safety and environmental standards applicable to the Hartelcorridor.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€24,200,000
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderplanned maintenanceHartelcorridorcivil engineering structures

01What is being requested

The Province of Zuid-Holland intends to form a construction team to carry out planned maintenance on the Hartelcorridor. The corridor connects Rotterdam Botlek with Spijkenisse and includes various civil engineering structures, including a traffic bridge, a storm surge barrier, a lock, and a bicycle bridge. The works include repair of civil engineering structures, replacement of moving parts, conservation, replacement of falls, electrotechnical installations, barrier tree cabinets, CE marking, sinkers, and public lighting fixtures. The contract is non-public and aimed at a collaboration with one or more market parties. The province is looking for a partner with experience in complex infrastructure maintenance, water and shipping structures, and who can comply with the safety and environmental standards applicable to the Hartelcorridor.

The Province of Zuid-Holland intends to award a contract for the execution of planned maintenance on the Hartelcorridor. The Province of Zuid-Holland wishes to enter into a partnership with one or more market parties in the form of a construction team (ECI model/collaborative model). The Hartelcorridor runs along the Hartel complex. This is a connection between Rotterdam Botlek and Spijkenisse via the Hartelkanaal and the Zoetwaterkanaal. To the west of the traffic bridge lies the Hartelkering, a storm surge barrier. To the east of the bridge lies a lock, the Grote Hartelsluis. Between the Ha

45221119Works

02Outcome

Awarded

Dura Vermeer Infra Landelijke Projecten BV

Award value
€24,200,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME10077×
2Dura Vermeer Infra Regionale Projecten BVSME10058×
3Heijmans Infra B.V.SME10067×
4KWS Infra B.V.SME9992×
5Arcadis Nederland B.V.SME99116×
6Haskoning Nederland B.V.SME99103×

06Legal themes that may be relevant here

07Frequently asked questions

What is the nature of the works for the Hartelcorridor?
The works include planned maintenance of civil engineering structures, the replacement of moving parts, conservation, the replacement of falls, electrotechnical installations, barrier tree cabinets, sinkers, and public lighting fixtures, as well as the application of CE marking.
Which objects are covered under the maintenance contract?
The maintenance concerns the Hartelcorridor, consisting of the traffic bridge, the Hartelkering (storm surge barrier), the Grote Hartelsluis, and a standalone bicycle bridge.
In what form will the contract be executed?
The contract will be executed in a construction team format, whereby a partnership is entered into with a combination of market parties.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 73 mln

Gegunde waarden in CPV 45 · werken n=3159