ClosedWorksEuropeanOpen

Construction Team New Build Production Hall Modernization Middenmeer

N.V. HVC · Open · 1 lots · 338177
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Construction Team New Build Production Hall Modernization – HVC has a public tender (TenderNed 338177) for the preparation and execution of a new production hall (8,004 m²). The procedure is closed, digital, and without a deadline or price quotation. There is no information regarding modifications, documents, or contact persons, but the CPV code 45000000 indicates a full construction contract.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Construction Team New Build Production Hall Modernization – HVC has a public tender (TenderNed 338177) for the preparation and execution of a new production hall (8,004 m²). The procedure is closed, digital, and without a deadline or price quotation. There is no information regarding modifications, documents, or contact persons, but the CPV code 45000000 indicates a full construction contract.

HVC intends to award a Contract to carry out, within a construction team in collaboration with a Contractor and its construction team partner(s), the preparations for the new build of the production hall and subsequently to enter into a works contract with the relevant Contractor for the realization of the new build of the production hall. For this project, HVC wishes to collaborate in a construction team consisting of HVC and its assistants and the Contractor to be contracted and its assistants. The construction team model enables HVC and the Contractor to best exploit and manage the most imp

45000000Works
1Construction Team New Build Production Hall Modernization Middenmeer

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9534×
2BINX Smartility B.V.SME9527×
3Dura Vermeer Infra Regionale Projecten BVSME9458×
4Van Gelder BVSME9453×
5KWS Infra B.V.SME9392×
6Hegeman Bouw & Infra B.V.SME9331×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific objective of the construction team agreement?
The objective is to collaborate with the contractor in the process from the Preliminary Design + (VO+) to the Final Design (DO) and subsequently to the Ready-for-Execution Design (UO) including the associated documents.
What does the assignment for the new build of the production hall entail?
The assignment includes the design of a production hall of 8,004 m² (92 x 87 m) with a receiving hall and a driveway, followed by the supply, construction, commissioning, and delivery ready-for-operation of this hall via a works contract.
In what manner is collaboration conducted during the preparation phase?
Work is carried out in a construction team consisting of HVC, its assistants, the contractor to be contracted, and its assistants. This model is intended to jointly exploit and manage the most important opportunities and risks of the realization.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159