AwardedWorksEuropeanOpen

Construction Team New Build Raw Materials Hall

De Meerlanden Holding N.V. · Open · 1 lots · 261549
Type
Works
45000000
Estimated value
€ 70K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

De Meerlanden Holding N.V. intends to form a construction team consisting of the contracting authority, the engineering firm Witteveen+Bos, and a contractor to be contracted along with its construction team partner(s). The objective is to jointly carry out the preparations for the new build of a raw materials hall and subsequently enter into a construction contract for the execution. The construction team model offers the opportunity to optimally utilize and manage risks and opportunities, with a focus on the transition from Final Design (DO) to Technical Design (TO) and Ready-for-Construction Design (UO). The procedure is public and no CPV code has been specified. The tender focuses on a collaboration in which all parties contribute their expertise to ensure an efficient, cost-effective, and timely delivery of the project.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€70,000
awarded value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
RIJSENHOUT
CharacteristicsCPV 45WorksEU tenderconstruction teamraw materials hallnew build

01What is being requested

De Meerlanden Holding N.V. intends to form a construction team consisting of the contracting authority, the engineering firm Witteveen+Bos, and a contractor to be contracted along with its construction team partner(s). The objective is to jointly carry out the preparations for the new build of a raw materials hall and subsequently enter into a construction contract for the execution. The construction team model offers the opportunity to optimally utilize and manage risks and opportunities, with a focus on the transition from Final Design (DO) to Technical Design (TO) and Ready-for-Construction Design (UO). The procedure is public and no CPV code has been specified. The tender focuses on a collaboration in which all parties contribute their expertise to ensure an efficient, cost-effective, and timely delivery of the project.

The contracting authority intends to award a contract to jointly carry out, within a construction team with a Contractor and its construction team partner(s), the preparations for the New Build of the Raw Materials Hall and subsequently enter into a construction contract with the relevant Contractor for the realization of the New Build of the Raw Materials Hall. The contracting authority wishes to collaborate on this project in a construction team consisting of the contracting authority, its engineering firm Witteveen+Bos, and the contractor to be contracted and its participating construction

45000000Works
1Lot 1

02Outcome

Awarded

Mobilis

Award value
€70,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME10065×
2BAM Infra B.V.SME10077×
3BINX Smartility B.V.SME10027×
4Boskalis Nederland B.V.SME10069×
5Van Gelder BVSME10053×
6KWS Infra B.V.SME9992×

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the construction team model for the New Build Raw Materials Hall?
The purpose of the construction team agreement is to jointly carry out the preparations for the new build with the Contractor and its construction team partner(s). In this process, parties collaborate to optimally utilize and manage the most important opportunities and risks of the project during the transition from Final Design (DO) to Technical Design (TO) and Ready-for-Construction Design (UO).
Which parties constitute the construction team for this project?
The construction team consists of the contracting authority, the engineering firm Witteveen+Bos, and the contractor to be contracted, including its participating construction team partner(s).
What is the intended next step after the preparation phase in the construction team?
After the joint preparations in the construction team, the intention is to enter into a construction contract with the relevant Contractor for the actual realization of the New Build of the Raw Materials Hall.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 70K

Gegunde waarden in CPV 45 · werken n=3159