AwardedWorksEuropeanRestrictedGreen

Construction team integrated contractor for Dé School voor Harderwijk

Landstede Groep · Restricted · 1 lots · 264142
Type
Works
45000000
Estimated value
€ 125K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Landstede Groep is seeking a construction team as an integrated contractor for the renovation and expansion of three educational locations in Harderwijk (Westeinde, Sypel and Kranenburg). The current buildings no longer meet the educational vision, are outdated, and lack optimal functionality, indoor climate, operational efficiency, and sustainability. The project includes a complete modernization, including energy-saving measures, improved air quality, and a new learning environment that makes professional practice visible and better connects the various courses. The contractor must offer an integrated approach, from design to delivery, with a focus on quality, timely delivery, and cost efficiency. The construction team is expected to have experience with educational buildings, sustainability, and the realization of multifunctional learning and working environments.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€125,000
awarded value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
ZWOLLE
CharacteristicsCPV 45WorksEU tenderGreen / SPPintegrated contractorschoolsustainability

01What is being requested

Landstede Groep is seeking a construction team as an integrated contractor for the renovation and expansion of three educational locations in Harderwijk (Westeinde, Sypel and Kranenburg). The current buildings no longer meet the educational vision, are outdated, and lack optimal functionality, indoor climate, operational efficiency, and sustainability. The project includes a complete modernization, including energy-saving measures, improved air quality, and a new learning environment that makes professional practice visible and better connects the various courses. The contractor must offer an integrated approach, from design to delivery, with a focus on quality, timely delivery, and cost efficiency. The construction team is expected to have experience with educational buildings, sustainability, and the realization of multifunctional learning and working environments.

In Harderwijk, VMBO, MBO, and adult education are located at various sites: Westeinde, Sypel, and Kranenburg. The existing facilities do not sufficiently align with the educational vision, are largely outdated, and require optimization in terms of functionality, indoor climate, operations, and sustainability. There is also a desire to realize a powerful new learning environment that makes (professional) practice more visible and connects various courses more closely.

45000000Works
1Lot 1

02Outcome

Awarded

BAM Bouw en Techniek bv

Award value
€125,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME10034×
2Hegeman Bouw & Infra B.V.SME9931×
3BINX Smartility B.V.SME9927×
4Van Gelder BVSME9753×
5Heijmans Utiliteit B.V.SME9627×
6Kernbouw B.V.SME9511×

06Tender documents

TN364307 - SF03 Aankondiging van een gegunde opdracht 20230301105039pdfMar 3, 2023 · 28 KB
Nota van inlichtingen 2022-07-01-1pdfJul 1, 2022 · 8 KB
Selectieleidraad integrale aannemer Harderwijk versie 2.0pdfJul 1, 2022 · 531 KB
Bijlage B1 - ChecklistdocxJun 15, 2022 · 80 KB
Bijlage B4.1 ��� Referentie selectiecriterium SC 1docxJun 15, 2022 · 84 KB
Bijlage B3.1 ��� Referentie Kerncompetentie 1docxJun 15, 2022 · 85 KB
Bijlage B2.1 - UEApdfJun 15, 2022 · 2097 KB
Bijlage B3.2 ��� Referentie Kerncompetentie 2docxJun 15, 2022 · 82 KB
Bijlage B4.1 ��� Referentie selectiecriterium SC 2docxJun 15, 2022 · 84 KB
TN364307 - SF02 Aankondiging van een opdracht 20220613083044pdfJun 15, 2022 · 25 KB
Bijlage A1 - Stroomschema UEA (ter informatie)pdfJun 15, 2022 · 178 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the objective of the renovation and expansion of the educational locations?
The project aims to modernize the Westeinde, Sypel, and Kranenburg locations to better align the facilities with the educational vision. The focus is on optimizing functionality, indoor climate, operations, and the sustainability of the buildings.
Which aspects of the learning environment are central to the assignment?
The assignment focuses on realizing a powerful new learning environment in which (professional) practice is made more visible and the various courses are better connected to one another.
In which areas must the integrated contractor focus?
The contractor must offer an integrated approach from design to delivery, with specific attention to quality, timely delivery, cost efficiency, and the implementation of energy-saving measures and improved air quality.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 125K

Gegunde waarden in CPV 45 · werken n=3159