Construction team and execution contract IKC Aarlesche Erven in Best
Stichting Best Onderwijs has a non-public tender for a construction team and execution contract for the IKC Aarlesche Erven in Best. The work is based on a Design-Only (DO) tender. Following selection, the design team will further develop the DO into a Technical Design (TO). During the execution phase, the chosen party will draw up the Execution Order (UO), for both the building/structural and the installation technology aspects. The project concerns a multifunctional childcare center in which the primary school, toddler care, and childcare work together in an integrated learning environment. The contracting authority expects a party with experience in educational construction projects, knowledge of the relevant building and safety standards, and the capacity to work closely with the design team to realize a coherent design and execution plan. The tender focuses on quality, sustainability, and timely delivery within the established frameworks.
Works · Restricted · European procedure
01What is being requested
Stichting Best Onderwijs has a non-public tender for a construction team and execution contract for the IKC Aarlesche Erven in Best. The work is based on a Design-Only (DO) tender. Following selection, the design team will further develop the DO into a Technical Design (TO). During the execution phase, the chosen party will draw up the Execution Order (UO), for both the building/structural and the installation technology aspects. The project concerns a multifunctional childcare center in which the primary school, toddler care, and childcare work together in an integrated learning environment. The contracting authority expects a party with experience in educational construction projects, knowledge of the relevant building and safety standards, and the capacity to work closely with the design team to realize a coherent design and execution plan. The tender focuses on quality, sustainability, and timely delivery within the established frameworks.
The work is tendered on a DO basis. After the procurement procedure, the design team will start further developing the DO into a TO. In the execution phase, the executing party will draw up the UO (both building/structural and installation technology). In the childcare center, the primary school, toddler care, and childcare work closely together, with shared development goals and in a continuous line. Children can play and learn there based on interest or development. They work on real problems there, together with the environment.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
In what manner will the assignment be technically elaborated?
What does the execution phase of this assignment entail?
What is the nature of the project to be realized?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159