Construction Team De Gors - Vurige staart
The Hoogheemraadschap Hollands Noorderkwartier (HHNK) is carrying out a 4 km long dike improvement at De Gors-Vurige Staart, located in the municipalities of Purmerend and Waterland, within the Verbetering Boezemkade (VBK3) programme. The works include the installation of new revetments, the reinforcement of the inner berm, and the widening of the cycle path including the footpath on the crest of the dike. The objective is to improve the regional flood defense so that it complies with the current IPO standards of the water boards. The contract is a non-public procedure of the works type, without a CPV code. The execution requires a combination of civil engineering, water management, and infrastructure, with attention to environmental and safety aspects. The contracting authority expects an integrated approach in which the dike, the inner berm, and the path connect seamlessly, with minimal disruption to the existing landscape and the water flow.
Works · Restricted · National procedure
01What is being requested
The Hoogheemraadschap Hollands Noorderkwartier (HHNK) is carrying out a 4 km long dike improvement at De Gors-Vurige Staart, located in the municipalities of Purmerend and Waterland, within the Verbetering Boezemkade (VBK3) programme. The works include the installation of new revetments, the reinforcement of the inner berm, and the widening of the cycle path including the footpath on the crest of the dike. The objective is to improve the regional flood defense so that it complies with the current IPO standards of the water boards. The contract is a non-public procedure of the works type, without a CPV code. The execution requires a combination of civil engineering, water management, and infrastructure, with attention to environmental and safety aspects. The contracting authority expects an integrated approach in which the dike, the inner berm, and the path connect seamlessly, with minimal disruption to the existing landscape and the water flow.
Within the Verbetering Boezemkade (VBK3) programme of HHNK, (regional) flood defenses that do not meet the current IPO standards of the water boards are being improved. From the assessment, a requirement has emerged for approximately 4 km of dike improvement for De Gors-Vurige Staart in the municipalities of Purmerend and Waterland. The works consist of improving the regional flood defense by installing revetments, reinforcing the inner berm, and widening the cycle path (including footpath) on the crest of the dike.
02Outcome
AW Infrabouw
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the exact scope of the dike improvement at De Gors-Vurige Staart?
What specific works are being carried out for the regional flood defense?
What is the objective of the works on the dike?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159