Construction Team Contractor - new construction primary school Karel de Grote
This tender concerns the realization of a new SPIL-centrum in Eindhoven via a construction team model. The assignment includes both the design and the full realization of approximately 1,977 m2 GFA.
Works · Restricted · European procedure
01What is being requested
The design and realization in a construction team of a SPIL-centrum with an area of approximately 1,977 m2 GFA for a primary school, daycare, and the GGD.
The contracting authority follows a European non-public procurement procedure in accordance with the Public Procurement Act (Aw) and the Public Procurement Regulations on Works 2016 (ARW 2016), published on the procurement platform TenderNed. The design and realization in a construction team of a SPIL-centrum with an area of approx. 2,200 m2 GFA, whereby the architect and design advisors are hired by the contracting authority as a design team. The building will provide space for the primary school Karel de Grote, BSO, the Korein daycare, and the GGD. The demolition of the existing structure a
02Strategic insight
Ensure that the reference assignments exactly meet the requirements for commercial building and the specific combination of users involving education and childcare. Check the validity of the insurance policy and the required certificates such as ISO and VCA in a timely manner. Take the social return obligation into account during the calculation.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Likely competitors
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What is the scope and purpose of the construction assignment?
Which activities are not included in the scope of this assignment?
How is the cooperation between the contracting authority and the design advisors organized?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159