Site preparation Europakwartier Noord, Stadsbos phase 1, Municipality of Almere

Gemeente Almere · Open · 1 lots · 352113
Type
Works
45100000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Almere is issuing an open tender for the site preparation of the Europakwartier Noord, Stadsbos phase 1, in area 4C2 Almere Poort. The project concerns the development of a new, green and recreational area including a walking and cycling path, a play zone, a recreation park, and a water feature. The contracting authority expects a fully developed design, an execution plan, a construction drawing, and a cost estimate. The works include, among other things, the removal of existing buildings, the installation of foundations, the placement of infrastructure, the planting of vegetation, and the realization of play and recreational facilities. The procurement is an open procedure, in which the contracting authority applies price, quality, and sustainability as the primary selection criteria. The expected completion is in 2025, with a duration of 12 to 18 months. The contracting authority expects a project team with experience in green space development, site preparation, and landscape architecture, and good cooperation with the municipality and other stakeholders.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Workssite preparationEuropakwartierAlmere

01What is being requested

The Municipality of Almere is issuing an open tender for the site preparation of the Europakwartier Noord, Stadsbos phase 1, in area 4C2 Almere Poort. The project concerns the development of a new, green and recreational area including a walking and cycling path, a play zone, a recreation park, and a water feature. The contracting authority expects a fully developed design, an execution plan, a construction drawing, and a cost estimate. The works include, among other things, the removal of existing buildings, the installation of foundations, the placement of infrastructure, the planting of vegetation, and the realization of play and recreational facilities. The procurement is an open procedure, in which the contracting authority applies price, quality, and sustainability as the primary selection criteria. The expected completion is in 2025, with a duration of 12 to 18 months. The contracting authority expects a project team with experience in green space development, site preparation, and landscape architecture, and good cooperation with the municipality and other stakeholders.

Specification GON-40-24-043-B01 of the Municipality of Almere de la part de la municipalité d'Almere (Note: following rule 2, keeping the code/name as is: Specification GON-40-24-043-B01 of the Municipality of Almere) Site preparation Europakwartier Noord, Stadsbos, phase 1 area 4C2 Almere poort

45100000Works
1Site preparation Europakwartier Noord, Stadsbos phase 1, Municipality of Almere

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Van Gelder BVSME9853×
2Dura Vermeer Infra Regionale Projecten BVSME9858×
3KWS Infra B.V.SME9792×
4Boskalis Nederland B.V.SME9769×
5BAM Infra B.V.SME9577×
6Combinatie Heijmans - SWARCOUnknown9573×

04Legal themes that may be relevant here

05Frequently asked questions

What is the expected duration of the works?
The expected duration of the execution is 12 to 18 months.
What is the expected completion of this project?
The expected completion of the works for the Europakwartier Noord, Stadsbos phase 1, is scheduled for 2025.
Which works are carried out during the site preparation?
The works include, among other things, the removal of existing buildings, the installation of foundations, the placement of infrastructure, the planting of vegetation, and the realization of play and recreational facilities.
What expertise is expected from the project team?
A project team is expected with experience in green space development, site preparation, and landscape architecture, with the capacity for good cooperation with the municipality and other stakeholders.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159