Site preparation of De Luwte phase 1 Swifterbant-Zuid

BPD Ontwikkeling B.V. · Open · 1 lots · 342292
Type
Works
45100000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This project involves the site preparation of approximately 17 hectares in Swifterbant-Zuid, including earthworks and sewerage works. The contracting authority assesses bids based on the best fit and not solely on price.

Works · Open · National procedure

Complete timeline
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
15:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The work concerns the site preparation of the first phase of De Luwte (approx. 17 ha) for the purpose of residential construction. The works include earthworks, installation of sewerage, drainage, culverts, foundation layers, and asphalt paving.

The work mainly consists of the site preparation of the first phase of De Luwte for the purpose of residential construction. The works are described in the RAW specifications. The procurement procedure is described in the Procurement Guidelines. These documents and their accompanying attachments can be downloaded as Documents.

45100000Works
1Site preparation of De Luwte phase 1 Swifterbant-Zuid

02Strategic insight

Strategic insight · AI analysis
Incorporate any discounts strictly into the unit prices to prevent exclusion. Ensure accurate quality assurance in accordance with the Standard 2020 and the specified stop and attendance points. Take into account the non-automatic award based on the lowest price.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The discount for late delivery of inspection and revision data amounts to € 1,000 per working day.Important
The discount for late completion amounts to 0.05% of the contract sum per working day, with a minimum of € 2,500 per calendar day.Important
A discount may not be listed as a one-off cost; it must be incorporated into the unit prices.Important
The contractor is responsible for the setting out of the center lines, coordinates, and all dimensions.Important
Account must be taken of a non-connected execution of works on the plot behind Bisonweg 11.Important

04Can I take part?

Technical — The contractor must possess a quality system relating to the nature of the work in accordance with article 01.13.01 of the Standard 2020.
Other — Cooperation with a Business Partner Due Diligence (BPDD) investigation is required, including the provision of information regarding ultimate beneficial owners (UBO).

05Award criteria

bidweight n/a

BPD Ontwikkeling BV reserves the right to make its own assessment as to which bid is the best fit and does not automatically apply the lowest price.

06Process & timeline

completed and delivered
2024-12-31
first parts completed before start of utility companies
2024-11-30
demolition and removal on plot Bisonweg 11
2024-10-01 tot 2024-12-31
execution of site preparation works Bisonweg 11
begin 2025

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9073×
2Boskalis Nederland B.V.SME8969×
3KWS Infra B.V.SME8892×
4Heijmans Infra B.V.SME8665×
5BAM Infra B.V.SME8577×
6Dura Vermeer Infra Regionale Projecten BVSME8558×

09Tender documents

BJ7066-RHD-ZZ-L1-DG-C-221001_tm 221002_BO_3.0_20240814 brm verhpdfAug 17, 2024 · 2901 KB
2e Nota van Inlicht._bestek BRM Swifterbant_Zuid fase 1 (D1)pdfAug 17, 2024 · 140 KB
BJ7066_Grondbalans BRM fase 1 (16-8-24)pdfAug 17, 2024 · 137 KB
Werkbestek BRM Swifterbant_Zuid fase 1 (WB2.0)rsxAug 17, 2024 · 706 KB
BJ7066-RHD-ZZ-L1-DG-C-231001 tm 231002_BO_6.0_20240814_brm riopdfAug 17, 2024 · 9736 KB
BJ7066-RHD-ZZ-L1-DG-C-281001-BO_3.0_20240814_brm veh rio profpdfAug 17, 2024 · 300 KB
Werkbestek BRM Swifterbant_Zuid fase 1 (WB2.0)pdfAug 17, 2024 · 549 KB
Werkbestek BRM Swifterbant_Zuid fase 1 (WB1.0)rsxJul 26, 2024 · 703 KB
Nota van Inlicht._bestek BRM Swifterbant_Zuid fase 1 (D1)pdfJul 26, 2024 · 145 KB
BJ7066_Grondbalans BRM fase 1 (16-7-24)pdfJul 26, 2024 · 457 KB
Vragen en Antwoorden BRM De Luwte fase 1pdfJul 26, 2024 · 439 KB
Leidraad met bijlagenzipJul 7, 2024 · 3093 KB

10Legal themes that may be relevant here

11Frequently asked questions

What does the assignment for the site preparation of De Luwte phase 1 entail?
The works include earthworks such as excavating ditches, sewerage and drainage trenches, the installation of sewerage, drainage and culverts, the application of foundation layers for construction roads, the application of asphalt paving for the main access route, and the setting out of K&L routes.
What is the intended scope of the first phase of the project?
The first phase concerns approximately 17 hectares, from which the realization of about 240 houses and two apartments will result.
Which timeframes apply to the execution of the work?
The work must be completed and delivered by December 31, 2024, at the latest. The first parts of the work must be completed by November 30, 2024, at the latest, such that utility companies can start the execution of K&L works.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159