OpenWorksEuropeanSME-friendlyRestrictedGreen

Building contractor and E&W installer for Construction Team renovation Gemeentehuis Medemblik in Wognum

Gemeente Medemblik · Restricted · 2 lots · 410937
Type
Works
45000000 · Building works
Estimated value
Not published
To deadline
-97d
Mar 11, 2026 · 12:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Promising — consider biddingconfidence high

This project concerns the realization phase of the renovation and sustainability of the Medemblik town hall in a construction team framework, during which building and installation technical works are carried out.

Works · Restricted · European procedure · SME-friendly

SME-friendlySustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
March 11, 2026
12:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Building works
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderGreen / SPP

01What is being requested

The assignment concerns the renovation and sustainability of the town hall in Medemblik (North, Middle, and South building) in construction team framework. The work includes building renovation of facades, roofs, floors, and interior walls, sustainability measures in accordance with the Sustainability Roadmap, internal renovation, and coordination with the W&E installer.

Through this tender, the building contractor and the E&W installer, hereinafter referred to as the contractors, are selected and contracted to initially take part in the construction team for the purpose of the renovation of the town hall. The TO will be elaborated within the construction team framework. After completing the TO phase within the construction team framework, the contractors to be contracted will be the first to have the right to submit a tender for the works to be carried out. If the final contract sum is accepted, then, provided there is agreement on the terms and conditions, t

45000000Works
1Building contractor for Construction Team renovation Gemeentehuis Medemblik in Wognum
2E&W installer for Construction Team renovation Gemeentehuis Medemblik in Wognum

02Breakdown by lot

Building contractor for Construction Team renovation Gemeentehuis Medemblik in Wognumn/a
E&W installer for Construction Team renovation Gemeentehuis Medemblik in Wognumn/a

Per-lot values not published — bars show only the lot breakdown.

03Strategic insight

Strategic insight · AI analysis
<ul Ensure strict written recording of all changes and additional work to prevent financial risks. Anticipate the limited accessibility and nuisance reduction, as the building will remain partially in use during execution. Ensure that the as-built documentation (including materials passport and warranty certificates) is prepared directly from the start to avoid delaying the formal handover.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 7
Additional and reduced work always requires a written instruction before execution; without a written instruction, no additional work will be compensated.Important
Unforeseen circumstances must be reported in writing within 5 working days.Important
Discounts in case of deadline exceedance are due upon exceeding the handover date (amount and maximum not specified in this part).Important
Bank guarantee of 5% of the contract sum must be provided before the start of the work.Important
Warranty periods for specific components such as roof sealings (10 years) and facade sealants/joints (5 years) deviate from the standard UAV 2012 period.Important
Nuisance limitation: the town hall remains partially in use, which requires specific measures for dust and noise reduction.Important
As-built documentation is a strict condition for handover; without complete documentation, the work will not be considered handed over.Important

05Can I take part?

Financial · 2
Business liability insurance (AVB) with a minimum coverage of € 2,500,000.00 per claim.Financial
Professional liability insurance with a minimum coverage of € 1,000,000.00 per claim.Financial
Technical · 1
Possession of a documented quality system including incoming inspection, process control, final inspection, and registration of deviations.Technical

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Unica Installatietechniek B.V.SME10022×
2Croonwolter&dros B.V.SME9936×
3BAM Bouw en Techniek bvSME9836×
4Haskoning Nederland B.V.SME98102×
5Van Gelder BVSME9853×
6Sweco Nederland B.V. SME9873×

09Tender documents

589370 Selectie- en Gunningsleidraad Aannemers BouwteampdfFeb 5, 2026 · 961 KB
Bijlage 8 Concept CoordinatieovereenkomstpdfFeb 5, 2026 · 228 KB
Biijlage 9a Concept AanneemovereenkomstpdfFeb 5, 2026 · 412 KB
TN568103 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260204132120pdfFeb 5, 2026 · 151 KB
Bijlage 16 Certificaat van verzekering Gemeente MedemblikpdfFeb 5, 2026 · 140 KB
Bijlage 4a De Nieuwe Regeling 2011pdfFeb 5, 2026 · 171 KB
uea_568103_20260122153730pdfFeb 5, 2026 · 351 KB
Bijlage 13 Vastgoedbeleid MedemblikpdfFeb 5, 2026 · 31841 KB
Bijlage 14 Circulaire Deal Secundaire Bouwmaterialen NHNpdfFeb 5, 2026 · 1192 KB
Bijlage 6 Concept BouwteamovereenkomstpdfFeb 5, 2026 · 488 KB
Bijlage 2 Masterplan Gemeente Medemblik WognumpdfFeb 5, 2026 · 30682 KB
Bijlage 5 Model K VerklaringdocxFeb 5, 2026 · 128 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the method of operation for the assignment in the first phase?
The selected building contractor and E&W installer will join a construction team. Within this construction team framework, the technical offer (TO) will be elaborated for the renovation of the town hall.
How does the process proceed after the completion of the technical offer (TO)?
After completing the TO phase within the construction team framework, the selected contractors will be the first to have the right to submit a final offer for the works. Upon acceptance of the contract sum, the agreement will be signed.
Which specific conditions must the contractors meet?
Bidders must meet the requirements set out in Annex 4b (additional conditions) and Annex 13 (real estate policy). Additionally, participation in the construction team environment and timely submission after the TO phase is mandatory.
Which suitability criteria are used for the selection?
Suitability criteria include experience with the renovation of municipal buildings, demonstrable experience in a construction team framework, and the ability to align labor closely with the project planning.

Automatically compiled from the official tender data and documents.