OpenWorksEuropeanRestricted

Building contractor construction team for sustainability and renovation of swimming pool De Bronspot in Brunssum

Gemeente Brunssum · Restricted · 1 lots · 427136
Type
Works
45212212 · Building works for swi
Estimated value
€ 4,16M
estimated
To deadline
20d
Jul 6, 2026 · 10:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
4 criteria
Assess manuallyconfidence high

This is a tender for the renovation and sustainability of swimming pool De Bronspot in Brunssum via a construction team. The contract has an estimated value of approximately 4.1 million euros and will be awarded based on EMVI.

Works · Restricted · European procedure

EuropeanComplete timeline
Contracting authority
Gemeente Brunssum
Zuid-Limburg
Contract type
Works
Restricted
Estimated value
€4,161,157
estimated value
Submission deadline
July 6, 2026
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Building works for swimming pool
Location
Brunssum, Zuid-Limburg
CharacteristicsCPV 45WorksEU tenderrenovationswimming poolsustainability

01What is being requested

The contract concerns the sustainability and renovation of swimming pool De Bronspot in a construction team arrangement. The work includes building, mechanical, and electrical works within a budget ceiling of € 4,161,157.

Swimming pool De Bronspot at Koutenveld 1B in Brunssum is highly outdated and has high energy and maintenance costs. The technical installations have reached the end of their life, the building envelope no longer meets current requirements, and regular malfunctions and leaks occur. Additionally, there are asbestos-containing materials and an outdated functional layout. This combination makes renovation necessary to make the swimming pool future-proof.

45212212€ 4,16MWorks
1Building contractor construction team for sustainability and renovation of swimming pool De Bronspot in Brunssum€4,793,888

02Strategic insight

Strategic insight · AI analysis
Ensure that the submitted reference exactly meets the requirements for area and public function. Pay close attention to the financial capacity and the required insurance amounts. Ensure a construction team approach in the engineering.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The realization must take place within a budget ceiling.Important
A hybrid system is used due to limited grid capacity.Important
The contract is executed in a construction team arrangement.Important
The engineering of the project is the responsibility of the construction team partner.Important

04Can I take part?

Technical · 3
Possesses experience in realizing a utility project with public functions, preferably a public swimming pool, where the role of building main contractor was fulfilled, with a minimum area of 2,000 m2 GFA.Technical
Possesses experience working in a construction team.Technical
Company certificate VCA**.Technical
Financial · 2
Annual accounts and auditor's report for the year 2025.Financial
AVB insurance policy with an insured amount of € 2,500,000.00 per claim and € 5,000,000.00 per insurance year.Financial
Other · 1
Conduct certificate for procurement (Gedragsverklaring Aanbesteden) not older than 2 years and a statement from the tax authorities not older than 6 months.Other

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Plan of approach55

Described in the tender instructions.

Planning15

Described in the tender instructions.

Fixed price construction team phase20

Described in the tender instructions.

Fictitious construction sum based on hourly rates and tail costs10

Described in the tender instructions.

07Process & timeline

Publication of announcement
1 juni 2026
Closing date for questions
15 juni 2026
Publication of memorandum of information
19 juni 2026
Closing date for application
6 juli 2026
Announcement of provisional selection decision
13 juli 2026
End of appeal period
20-24 juli 2026
Sending of invitations to tender
31 juli 2026
Closing date for tender questions
17 augustus 2026
Sending of memorandum of information
31 augustus 2026
Closing date for tender
21 september 2026
Sending of award notification
5 oktober 2026
Conclusion of construction team agreement
26 oktober 2026
Start bouw
week 3 2027
Ingebruikname zwembad
week 38 2027

08Value in context

€4,161,157

09Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9477×
2Dura Vermeer Infra Regionale Projecten BVSME9458×
3Boskalis Nederland B.V.SME9369×
4Combinatie Heijmans - SWARCOUnknown9273×
5KWS Infra B.V.SME9192×
6BINX Smartility B.V.SME8927×

10Tender documents

Tekeningen cf documentenlijst dd 29 mei 2026_De Bronspot gemeente BrunssumzipJun 2, 2026 · 94357 KB
uea_592189_20260527100945pdfJun 2, 2026 · 601 KB
Selectieleidraad zwembad De Bronspot gemeente Brunssum_versie ter publicatie 1 juni 2026pdfJun 2, 2026 · 621 KB
Referentieformulier geschiktheidseis De BronspotdocxJun 2, 2026 · 19 KB
TN592189 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260601101527pdfJun 2, 2026 · 206 KB
Referentieformulier selectiecriteria De BronspotdocxJun 2, 2026 · 19 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the purpose of the renovation of swimming pool De Bronspot?
The renovation is necessary to make the swimming pool future-proof, as the technical installations have reached the end of their life, the building envelope no longer meets current requirements, and there are asbestos-containing materials.
What is the nature of the works for this construction team?
The contract concerns the sustainability and renovation of swimming pool De Bronspot, addressing the high energy and maintenance costs and the outdated functional layout.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,2 mln

Gegunde waarden in CPV 45 · werken n=3159