Construction and residential site preparation plan Zilverberg Overasselt

Gemeente Heumen · Restricted · 1 lots · 410757
Type
Works
45000000 · Construction works
Estimated value
€ 4,00M
estimated
To deadline
-110d
Feb 26, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

The Municipality of Heumen is looking for a construction team partner for the construction and residential site preparation of the Zilverberg planning area in Overasselt. The assignment consists of a development/preparation phase and a realization phase with a total budget of 4 million euros.

Works · Restricted · National procedure

1 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
€4,000,000
estimated value
Submission deadline
February 26, 2026
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Construction works
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The project concerns the construction and residential site preparation of the Zilverberg planning area in Overasselt, including the design phase (construction team) and the realization phase. The assignment includes the deployment for co-design, preparation, coordination, planning, phasing, environmental management, risk control, and execution, with a total budget of €4,000,000.00 excl. VAT.

Construction team request for the construction and residential site preparation of Plan Zilverberg in Overasselt.

45000000€ 4,00MWorks
1Construction and residential site preparation plan Ziverberg Overasselt€4,000,000

02Strategic insight

Strategic insight · AI analysis
<ul Focus on an integrated approach where expertise in both the design phase and the realization phase is demonstrated. Emphasize the capacity for proactive collaboration within a construction team and the role as a leading party. Ensure a strong substantiation regarding sustainability, risk control, and environmental management.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The assignment is carried out via a construction team approach in which the selected partner is also the intended contractor for the execution.Important
A choice is made for one assignment for the entire project without splitting into lots.Important
The contractor must actively contribute to sustainability, nature restoration, and nature measures.Important
There is a strong focus on environmental management and coordination with stakeholders such as the project developer and the immediate surroundings.Important
The contractor is responsible for controlling risks during both the planning and the realization phases.Important

04Can I take part?

Exclusion ground · 1
Compliance with the mandatory and optional exclusion grounds in accordance with the UEA.Exclusion ground
Technical · 2
Compliance with the suitability requirements for procedural and technical competence as described in the selection guide.Technical
Demonstration of core competencies.Technical

05Exclusion grounds

Exclusion grounds (1)
  • Compliance with the mandatory and optional exclusion grounds in accordance with the UEA.

06Process & timeline

Construction team phase
Eind 2026
BRM – 1st phase
30 juni 2027
WRM 1st phase and/or other phases of construction or residential site preparation
N.t.b., in overleg en afstemming met opdrachtgever en Pro Projectontwikkeling B.V.

07Value in context

€4,000,000

08Likely competitors

#Likely bidderFitWins
1Van Gelder BVSME10053×
2Boskalis Nederland B.V.SME9969×
3KWS Infra B.V.SME9892×
4Combinatie Heijmans - SWARCOUnknown9773×
5Heijmans Infra B.V.SME9665×
6Den Ouden Aannemingsbedrijf B.V.SME9623×

09Tender documents

TN568649 - EFE3 Vrijwillige aankondiging van een opdracht 20260203130919pdfFeb 3, 2026 · 140 KB
Bijlage 3 - Format ReferenteprojectdocxFeb 3, 2026 · 23 KB
SL-D01-41246253-lfs-Selectiedraad ZilverbergpdfFeb 3, 2026 · 681 KB
UEA_Tender BRM en WRM Plan ZilverbergpdfFeb 3, 2026 · 337 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the objective of the assignment for Plan Zilverberg?
The assignment concerns the construction and residential site preparation of the plan Zilverberg in Overasselt, where houses will be built in the future. The Municipality of Heumen intends to carry out these works through a construction team collaboration.
Which suitability criteria must an entrepreneur meet?
Entrepreneurs must have legal and fiscal certainty regarding participation in the tender, which includes, among other things, registration with the Chamber of Commerce and the ability to obtain a building permit.
What are the mandatory selection requirements for participation?
Bidders must guarantee full compliance with the general terms and conditions, the selection criteria, and the documentation as stated in the tender notice.
How is the collaboration structured?
The works are carried out through a construction team collaboration, in which the expectations and responsibilities are established within the construction team contract.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,0 mln

Gegunde waarden in CPV 45 · werken n=3159