Construction and residential site preparation plan Zilverberg Overasselt
Gemeente Heumen · Restricted · 1 lots · 410757
5
5 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Works
45000000 · Construction works
Estimated value
€ 4,00M
estimated
To deadline
-110d
Feb 26, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high
The Municipality of Heumen is looking for a construction team partner for the construction and residential site preparation of the Zilverberg planning area in Overasselt. The assignment consists of a development/preparation phase and a realization phase with a total budget of 4 million euros.
Works · Restricted · National procedure
1 exclusion groundsComplete timeline
CharacteristicsCPV 45Works
01What is being requested
The project concerns the construction and residential site preparation of the Zilverberg planning area in Overasselt, including the design phase (construction team) and the realization phase. The assignment includes the deployment for co-design, preparation, coordination, planning, phasing, environmental management, risk control, and execution, with a total budget of €4,000,000.00 excl. VAT.
Construction team request for the construction and residential site preparation of Plan Zilverberg in Overasselt.
1Construction and residential site preparation plan Ziverberg Overasselt€4,000,000
02Strategic insight
Strategic insight · AI analysis
<ul Focus on an integrated approach where expertise in both the design phase and the realization phase is demonstrated. Emphasize the capacity for proactive collaboration within a construction team and the role as a leading party. Ensure a strong substantiation regarding sustainability, risk control, and environmental management.
03Points of attention
Important · 5
The assignment is carried out via a construction team approach in which the selected partner is also the intended contractor for the execution.Important
A choice is made for one assignment for the entire project without splitting into lots.Important
The contractor must actively contribute to sustainability, nature restoration, and nature measures.Important
There is a strong focus on environmental management and coordination with stakeholders such as the project developer and the immediate surroundings.Important
The contractor is responsible for controlling risks during both the planning and the realization phases.Important
04Can I take part?
Exclusion ground · 1
Compliance with the mandatory and optional exclusion grounds in accordance with the UEA.Exclusion ground
Technical · 2
Compliance with the suitability requirements for procedural and technical competence as described in the selection guide.Technical
Demonstration of core competencies.Technical
05Exclusion grounds
Exclusion grounds (1)
- Compliance with the mandatory and optional exclusion grounds in accordance with the UEA.
06Process & timeline
Construction team phase
Eind 2026
BRM – 1st phase
30 juni 2027
WRM 1st phase and/or other phases of construction or residential site preparation
N.t.b., in overleg en afstemming met opdrachtgever en Pro Projectontwikkeling B.V.
07Value in context
€4,000,000
08Likely competitors
#Likely bidderFitWins
1Van Gelder BVSME10053×
2Boskalis Nederland B.V.SME9969×
3KWS Infra B.V.SME9892×
4Combinatie Heijmans - SWARCOUnknown9773×
5Heijmans Infra B.V.SME9665×
6Den Ouden Aannemingsbedrijf B.V.SME9623×
09Tender documents
TN568649 - EFE3 Vrijwillige aankondiging van een opdracht 20260203130919pdfFeb 3, 2026 · 140 KB
Bijlage 3 - Format ReferenteprojectdocxFeb 3, 2026 · 23 KB
SL-D01-41246253-lfs-Selectiedraad ZilverbergpdfFeb 3, 2026 · 681 KB
UEA_Tender BRM en WRM Plan ZilverbergpdfFeb 3, 2026 · 337 KB
10Legal themes that may be relevant here
Advies 63> Meervoudig onderhandse aanbesteding voor het reinigen van wegen, straten en pleinen. Kan bij gunning op laagste prijs de indieniAdvies 53> Europese openbare procedure voor een overheidsopdracht tot het verrichten van diensten bestaande uit (dagelijks en periodiek) scAdvies 48> Europese niet-openbare procedure voor werktuigkundige en elektrotechnische installaties van de nieuwbouw van een multifunctionelAdvies 98> Europese openbare aanbestedingsprocedure voor een raamovereenkomst met één ondernemer voor het vervangen van armaturen (straatveAdvies 59> Meervoudig onderhandse aanbestedingsprocedure met betrekking tot een opdracht voor de levering van postdiensten en bezorging. In
11Frequently asked questions
What is the objective of the assignment for Plan Zilverberg?
The assignment concerns the construction and residential site preparation of the plan Zilverberg in Overasselt, where houses will be built in the future. The Municipality of Heumen intends to carry out these works through a construction team collaboration.
Which suitability criteria must an entrepreneur meet?
Entrepreneurs must have legal and fiscal certainty regarding participation in the tender, which includes, among other things, registration with the Chamber of Commerce and the ability to obtain a building permit.
What are the mandatory selection requirements for participation?
Bidders must guarantee full compliance with the general terms and conditions, the selection criteria, and the documentation as stated in the tender notice.
How is the collaboration structured?
The works are carried out through a construction team collaboration, in which the expectations and responsibilities are established within the construction team contract.
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
p25
€ 1,4 mln
€ 1,4 mln
median
€ 3,6 mln
€ 3,6 mln
p75
€ 9,1 mln
€ 9,1 mln
€ 4,0 mln
Gegunde waarden in CPV 45 · werken n=3159