BMS 3.0 further development additional works
The Provincie Noord-Holland is looking for a supplier to further develop the existing Brug Management Systeem (BMS) to version 3.0. This additional work focuses on supporting user requirements and the transition from local to central and route-based operation of bridges and locks. The number of bridges controlled via control centres has increased, making extra functionality and scalability necessary. The assignment is a supply contract, carried out via a negotiation without publication, and builds upon the previous BMS 3.0 tender from 2017 (TN 157757).
Supplies · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
The Provincie Noord-Holland is looking for a supplier to further develop the existing Brug Management Systeem (BMS) to version 3.0. This additional work focuses on supporting user requirements and the transition from local to central and route-based operation of bridges and locks. The number of bridges controlled via control centres has increased, making extra functionality and scalability necessary. The assignment is a supply contract, carried out via a negotiation without publication, and builds upon the previous BMS 3.0 tender from 2017 (TN 157757).
The additional work concerns the further development of the existing Brug Management Systeem (BMS) for the purpose of user requirements and transitions in bridge and lock operation. The number of bridges controlled from control centres has increased. The requested services are required for the (preparation of) the transition from local to central and route-based operation. The services belong to the BMS 3.0 assignment, which was publicly tendered in 2017 (TN reference 157757).
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the BMS 3.0 further development additional works assignment?
Why is this further development of the BMS necessary?
On which previous tender is this assignment based?