AwardedWorksEuropeanRestricted

Bidding procedure for the development of (water) houses Ald Rien phase 2 in Oosthem

Gemeente Súdwest-Fryslân · Restricted · 283479
Type
Works
45211300
Estimated value
€ 1,13M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Súdwest-Fryslân has a non-public bidding procedure for the development of a new residential project in Oosthem. The assignment includes the transfer of building land and a development mandate for the realization of 15 houses: six detached water houses, four semi-detached houses, and five terraced houses. The procurement focuses on the complete construction, including foundations, structure, water and drainage installations, and finishing in accordance with local building and environmental standards. The contracting authority expects an integrated approach with attention to sustainability, water safety, and timely delivery within the specified period. The procedure is non-public, meaning only a limited number of certified contractors are invited to submit a proposal.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€1,129,000
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderwater housesdevelopment mandatebuilding land

01What is being requested

The Municipality of Súdwest-Fryslân has a non-public bidding procedure for the development of a new residential project in Oosthem. The assignment includes the transfer of building land and a development mandate for the realization of 15 houses: six detached water houses, four semi-detached houses, and five terraced houses. The procurement focuses on the complete construction, including foundations, structure, water and drainage installations, and finishing in accordance with local building and environmental standards. The contracting authority expects an integrated approach with attention to sustainability, water safety, and timely delivery within the specified period. The procedure is non-public, meaning only a limited number of certified contractors are invited to submit a proposal.

The transfer of building land with a development mandate for the realization of six (detached) water houses, four semi-detached houses, and five terraced houses.

45211300Works

02Outcome

Awarded

Bouwbedrijf J. Heeringa B.V.

Award value
€1,129,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2KWS Infra B.V.SME9592×
3Combinatie Heijmans - SWARCOUnknown9473×
4Heijmans Infra B.V.SME9465×
5Van Gelder BVSME9453×
6BAM Infra B.V.SME9377×

06Tender documents

TN392114 - SF03 Aankondiging van een gegunde opdracht 20230731123201pdfAug 2, 2023 · 25 KB
Bijlage A8 - Perceelstekening Ald Rien fase 2 OosthempdfJan 26, 2023 · 504 KB
Nota van inlichtingen 2023-01-26-1pdfJan 26, 2023 · 2 KB
Bijlage A6 - Koop- en realisatieovereenkomstpdfDec 24, 2022 · 237 KB
TN392114 - SF02 Aankondiging van een opdracht 20221221130919pdfDec 22, 2022 · 33 KB
Bijlage A7 - Algemene verkoopvoorwaardenpdfDec 22, 2022 · 402 KB
Bijlage A5 - Handleiding voor ondernemingenpdfDec 22, 2022 · 776 KB
Bijlage A4 - Opgaveformulier referentiedocxDec 22, 2022 · 20 KB
Bijlage A3 - Uniform Europees AanbestedingsdocumentpdfDec 22, 2022 · 2098 KB
Bijlage A2 - Verklaring combinatievormingdocxDec 22, 2022 · 34 KB
Bijlage A1 - AanmeldingsformulierdocxDec 22, 2022 · 34 KB
Selectieleidraad - Biedprocedure woningbouw OosthempdfDec 22, 2022 · 937 KB

07Legal themes that may be relevant here

08Frequently asked questions

What does the development mandate for Ald Rien phase 2 entail?
The assignment concerns the transfer of building land and the realization of fifteen houses, consisting of six detached water houses, four semi-detached houses, and five terraced houses.
What is the scope of the residential construction project in Oosthem?
The project includes the construction of a total of 15 houses, divided into six detached water houses, four semi-detached houses, and five terraced houses.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,1 mln

Gegunde waarden in CPV 45 · werken n=3159