Improved utilization of electricity network capacity
The Ministry of Economic Affairs and Climate Policy (EZK) is requesting innovative products and services that increase the utilization rate of existing or newly constructed electricity networks. The assignment focuses on solutions that deploy grid capacity more efficiently, for example through smart grids, demand response, energy storage, and advanced grid management software. Parties must demonstrate that their offering is scalable, cost-effective, and technically compatible with current infrastructure and regulations. The focus lies on achieving a higher energy density, reducing capacity constraints, and facilitating the energy transition. The assignment is open and aimed at stimulating market innovation within the energy sector.
Services · Open · National procedure
01What is being requested
The Ministry of Economic Affairs and Climate Policy (EZK) is requesting innovative products and services that increase the utilization rate of existing or newly constructed electricity networks. The assignment focuses on solutions that deploy grid capacity more efficiently, for example through smart grids, demand response, energy storage, and advanced grid management software. Parties must demonstrate that their offering is scalable, cost-effective, and technically compatible with current infrastructure and regulations. The focus lies on achieving a higher energy density, reducing capacity constraints, and facilitating the energy transition. The assignment is open and aimed at stimulating market innovation within the energy sector.
The Ministry of Economic Affairs and Climate Policy (EZK) challenges parties to develop new products and services with the aim of better utilizing the capacity of existing or newly to be constructed electricity networks, i.e.: increasing the utilization rate of electricity networks.
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the objective of this assignment?
Which solutions are targeted in this tender?
What requirements are imposed on the proposed solutions?
What role does sustainability play in this assignment?
Automatically compiled from the official tender data and documents.