Specification 2433, section 40. Reconstruction N345 De Kar
Provincie Gelderland is issuing an open procedure for the reconstruction of the N345 (De Kar) between km 4.700 and km 5.800 in the municipality of Apeldoorn. The project concerns full road restoration, including demolition, earthworks, underground works, asphalt and concrete paving, drainage, road surfacing, traffic signs, and lighting installations. The contractor must comply with Dutch and EU regulations for road construction, environmental protection, and traffic safety. A detailed project plan is expected, including timelines, safety and environmental management, quality controls, and a traffic management plan. The tender requires financial stability, relevant experience with similar road projects, insurance, and the ability to involve local labor. Execution must take place within the specified timeframe and budget, with regular reporting to the province.
Works · Open · National procedure
01What is being requested
Provincie Gelderland is issuing an open procedure for the reconstruction of the N345 (De Kar) between km 4.700 and km 5.800 in the municipality of Apeldoorn. The project concerns full road restoration, including demolition, earthworks, underground works, asphalt and concrete paving, drainage, road surfacing, traffic signs, and lighting installations. The contractor must comply with Dutch and EU regulations for road construction, environmental protection, and traffic safety. A detailed project plan is expected, including timelines, safety and environmental management, quality controls, and a traffic management plan. The tender requires financial stability, relevant experience with similar road projects, insurance, and the ability to involve local labor. Execution must take place within the specified timeframe and budget, with regular reporting to the province.
Specification 2433, section 40. Reconstruction N345. De Kar. km 4.700 - km 5.800 in the municipality of Apeldoorn in the Provincie Gelderland.
02Outcome
Gebr. van Kessel Wegenbouw BV
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What does the assignment for the reconstruction of the N345 entail?
Which requirements must the execution of the project meet?
What qualifications are expected from the contractor?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln