ClosedWorksOpen

Best Value Procurement Realisation of Facilities Cluster Zwartewaal

Gemeente Brielle · Open · 1 lots · 229452
Type
Works
45210000
Estimated value
€ 4,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Brielle has issued an open tender for an engineering and construction contract to realise a facilities cluster. The cluster includes a new village centre, a primary school, and a sports hall (sportzaal). The contract requires an integrated approach in which the three functions connect seamlessly, both in terms of design and logistics. The tender calls for a technically, functionally, and aesthetically high-quality result, with attention to sustainability, energy efficiency, and accessible spaces. The contracting authority expects a project team with experience in multifunctional construction projects, a clear schedule, a realistic budget, and transparent communication. The execution must comply with applicable building and safety standards and local regulations. The tender is open, allowing a wide range of bidders to participate.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€4,500,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
BRIELLE
CharacteristicsCPV 45Worksfacilities clusterVillage centreprimary school

01What is being requested

The Municipality of Brielle has issued an open tender for an engineering and construction contract to realise a facilities cluster. The cluster includes a new village centre, a primary school, and a sports hall (sportzaal). The contract requires an integrated approach in which the three functions connect seamlessly, both in terms of design and logistics. The tender calls for a technically, functionally, and aesthetically high-quality result, with attention to sustainability, energy efficiency, and accessible spaces. The contracting authority expects a project team with experience in multifunctional construction projects, a clear schedule, a realistic budget, and transparent communication. The execution must comply with applicable building and safety standards and local regulations. The tender is open, allowing a wide range of bidders to participate.

Concerns an Engineering and Construction task for the realisation of a facilities cluster (Village centre, primary school, sports hall).

45210000€ 4,50MWorks
1Lot 1€4,500,000

02Value in context

€4,500,000

03Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9473×
2BAM Infra B.V.SME9477×
3Van Gelder BVSME9453×
4Hegeman Bouw & Infra B.V.SME9031×
5BINX Smartility B.V.SME9027×
6Bouwgroep Dijkstra DraismaUnknown8311×

04Tender documents

NVI 2 bijlage 1 Planindeling sportzaalpdfJul 22, 2021 · 1877 KB
NVI 2 bijlage 3 Leveringen sportzaalpdfJul 22, 2021 · 531 KB
Nota van inlichtingen 2 dd 220721pdfJul 22, 2021 · 106 KB
NVI 2 bijlage 2 Belijning sportzaalpdfJul 22, 2021 · 265 KB
TN314597 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20210715135854pdfJul 15, 2021 · 13 KB
Mededeling 1 150721pdfJul 15, 2021 · 87 KB
20504_ZwB_DO_0002 FunderingpdfJul 7, 2021 · 74 KB
20504_ZwB_DO_0401 Details VerdiepingpdfJul 7, 2021 · 142 KB
20504_ZwB_DO_0400 Details Begane grondpdfJul 7, 2021 · 387 KB
20504_ZwB_DO_0101 Eerste verdiepingpdfJul 7, 2021 · 782 KB
20504_ZwB_DO_0102 DakpdfJul 7, 2021 · 1988 KB
Tekeningenlijst DO ConstructiepdfJul 7, 2021 · 19 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the contract for the realisation of the facilities cluster?
The contract concerns an engineering and construction task for the realisation of a facilities cluster, consisting of a village centre, a primary school, and a sports hall (sportzaal).
Which aspects are central to the realisation of the facilities cluster?
The contract requires an integrated approach in which the village centre, the primary school, and the sports hall connect seamlessly in terms of design and logistics.
What qualitative requirements must the construction result meet?
The result must be technically, functionally, and aesthetically high-quality, with attention to sustainability, energy efficiency, and accessible spaces.
What is expected of the project team?
The project team must have experience with multifunctional construction projects and must ensure a clear schedule, a realistic budget, and transparent communication.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,5 mln

Gegunde waarden in CPV 45 · werken n=3159