ClosedWorksEuropeanCompetitive procedure with negotiationGreen

HbR Business Housing Eemhavenweg

Havenbedrijf Rotterdam NV · Competitive procedure with negotiation · 1 lots · 361120
Type
Works
45210000
Estimated value
€ 31M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Havenbedrijf Rotterdam (HbR) intends to redevelop its site at Eemhavenweg 10-14. The existing buildings will be split and reconfigured into two parts. The new construction must provide accommodation for various departments and training programs of the Havenmeester Division and the Asset Management department. A key objective is to achieve ambitious sustainability goals: reducing the CO2 emissions of its own corporate real estate and contributing to the energy transition. HbR strives for a building that meets Dutch climate goals, utilizing innovative energy solutions, circular building materials, and a high level of energy efficiency. The tender is conducted under a competitive procedure with negotiation, aimed at a construction contract with a strong focus on sustainability and future-proof infrastructure.

Works · Competitive procedure with negotiation · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
€31,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPsustainabilityCO2 reductionport

01What is being requested

Havenbedrijf Rotterdam (HbR) intends to redevelop its site at Eemhavenweg 10-14. The existing buildings will be split and reconfigured into two parts. The new construction must provide accommodation for various departments and training programs of the Havenmeester Division and the Asset Management department. A key objective is to achieve ambitious sustainability goals: reducing the CO2 emissions of its own corporate real estate and contributing to the energy transition. HbR strives for a building that meets Dutch climate goals, utilizing innovative energy solutions, circular building materials, and a high level of energy efficiency. The tender is conducted under a competitive procedure with negotiation, aimed at a construction contract with a strong focus on sustainability and future-proof infrastructure.

HbR is working on the redevelopment of its site at Eemhavenweg 10-14. The existing site will be split and reconfigured into two parts. The new construction has been assigned an ambitious sustainability goal, so that it contributes to HbR's climate goals to reduce the CO2 emissions of its own corporate real estate. As the developer of the port, HbR is committed to developing the port into the place where the energy transition takes shape. The Netherlands faces the challenge of making the economy and society almost CO2-neutral within 30 years. The new construction will serve as a home for variou

45210000€ 31MWorks
1HbR Business Housing Eemhavenweg€31,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€31,000,000

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9492×
2Boskalis Nederland B.V.SME9469×
3Combinatie Heijmans - SWARCOUnknown9273×
4Dura Vermeer Infra Regionale Projecten BVSME9258×
5Hegeman Bouw & Infra B.V.SME9131×
6BAM Bouw en Techniek bvSME9034×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the redevelopment of Eemhavenweg 10-14?
The site will be split and reconfigured into two parts. The new construction will provide accommodation for various departments and training programs of the Havenmeester Division and the Asset Management department.
Which sustainability objectives are linked to this contract?
The new construction must contribute to the climate goals of Havenbedrijf Rotterdam by reducing the CO2 emissions of its own corporate real estate.
What role does the contract play in the energy transition?
As the developer of the port, Havenbedrijf Rotterdam is committed to developing the port into the place where the energy transition takes shape.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 31 mln

Gegunde waarden in CPV 45 · werken n=3159